Loading…
Loading…
59,304 results • Best match
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - NIT50 Providing repair and electrical maintenance works in CTO building Telephone house Rajbhavan Road Bengaluru; Substation, Electrical System or Installation; Service..
and Installation of Plant Systems/Equipments (Version 2) - NIT50 Providing repair and electrical maintenance works in CTO building Telephone house Rajbhavan Road Bengaluru; Substation
GENERAL-Annual Electrical Maintenance Thiruvananthapuram Division-Urgent Electrification and electrical maintenance work under Harbour Engineering South Circle Thiruvanathapuram-General Electrical Work
Work Name:GENERAL-Annual Electrical Maintenance Thiruvananthapuram Division-Urgent Electrification and electrical maintenance work under Harbour Engineering South Circle Thiruvanathapuram-General Electrical Work
REPAIR/ REPLACEMENT OF LT PANEL APFC PANEL AND ALLIED WORKS OF ELECTRICAL INSTALLATIONS AT NAMS UNDER GE NAMS
M&L in replacement for earthing complete with galvanized iron or steel plate electrode 600 mm x 600 mm x 6.00 mm thick buried directly in ground vertically in pit of depth not less than 2.25 metre below normal ground level with top edge of the earth plate at a depth not less than 1.5 metre below normal ground level surrounded from all sides with mixture of charcoal and common salt in alternate layers and electrode connected to galvanized iron strip 32 x 6 mm dia as earthing lead by means of GI bolts, nuts, check nuts and washers, earth strip protected by galvanized steel pipe 40 mm bore (light grade) connected to machinery/ equipment all as shown in electrical plate No. 3 of SSR-2010 Part I and including necessary excavation and earth work in any type of soil, 20mm bore light grade GI pipe for watering, funnel, wire mesh, PCC (1:3:6) type C-1 chamber, MS cover of thickness 5mm openable type and having suitable locking arrangement and MS frame of suitable size made of angle iron 50 x 50 x 60 mm, complete all as specified and as directed. Note: (i) The unit rate includes earth lead and protection pipe up to maximum 7.5 metre from earth plate to earth point/test point. (ii) Earth pit shall be constructed minimum 0.5 metre away from earth.
DEPOSIT-SITC of UPS at various Revenue Offices-SITC of UPS and allied Electrical works at Chelora Village office-General Electrical Work
2.3.3:Supplying and fixing following way, single pole and neutral, sheet steel, MCB distribution board, 240 volts, on surface/ recess, complete with tinned copper bus bar, neutral bus bar, earth bar, din bar, interconnections, powder painted including earthing etc. as required. (But without MCB/RCCB/Isolator) 12 way, Double door
DEPOSIT-SITC of UPS at various Revenue Offices-SITC of UPS and allied Electrical works at Edakkad Village office-General Electrical Work
2.3.3:Supplying and fixing following way, single pole and neutral, sheet steel, MCB distribution board, 240 volts, on surface/ recess, complete with tinned copper bus bar, neutral bus bar, earth bar, din bar, interconnections, powder painted including earthing etc. as required. (But without MCB/RCCB/Isolator) 12 way, Double door
Additional works and construction of under ground pump room for District storage center of VVPAT machine store-Electrical Fire Fighting Work
Work Name:GENERAL-VVPAT Storage Idukki - Additional fire fighting work-Additional works and construction of under ground pump room for District storage center of VVPAT machine store-Electrical Fire Fighting Work