Loading…
Loading…
60,555 results • Best match
OPERATION AND MAINTENANCE WORK OF EXISTING STREET LIGHTING SYSTEM AND OTHER ALLIED ELECTRICAL WORKS IN WARD NO-115.
OPERATION AND MAINTENANCE WORK OF EXISTING STREET LIGHTING SYSTEM AND OTHER ALLIED ELECTRICAL WORKS IN WARD NO-118.
Temporary Electrical works or commissioning, DCRC, Counting including special work in the campus like Media Centre, Police Tent for senior officers and allied works for 152 Tollygunje AC in Conection with the ensuing General Assembly Election 202
Supplying and laying on hire basis 3.5 core 185 sq.mm. PVC/Al. cable laying in trench
Temporary Electrical works in connection with upcoming General Election to WBLA, 2026 EI work, DG Set and PA System for Vehicle Transport Parking Zone, under MES III, PWD.
Special Terms and conditions for Temporary E.I. Work - 1) Earthing should conform to IS specification. Earth Continuity wire should not be broken / Jointed. Single Earth continuity wire should be used from Earth Bus-Bar to the installation. 2) All 3ɸ Electrical Panel Should be earthed by two nos. of separate earthing and 1ɸ panel should be earthed by one no earthing. 3) MCB / Rewirable Fuse type Distrubution Board should be installed with proper Trip Current setting / fuse wires. However, MCB type DBs are preferable. 4) No Part of the Electrical Circuit in the pandal / Structure shall be within 12 inches of any decorative cloth / paper. 5) Ordinary Flexible wires should not be used. Only new PVC insulated & sheathed wires (Bearing ISI mark) or PVC insulated wires of FRLS (Fire Resistant Low Smoke) type (ISI Marked) are allowed. 6) All cable ends should be properly sockedted. 7) All joints shall be made with porceline insulated connectors. Twisted & lapped joints shall be avoided. But Joints are strictly not allowed in the dias. 8) Cables / Wires should run along outside the Dias. 9) Ceiling fan (s) / Electrical fittings must not be suspended from the ceiling of Dias. Pedestal fans are not allowed on the Dias. However, Pedestal fans may be installed outside dias, but the body of the fan must be properly earthed.
WORK MENSION IN BOQ
Under ground laying of Following cable in Single circuit on river sand to Double pole situated at both sides of road complete in all respect. Minimum depth should be 0.75 Mtr and cable should be covered by bricks from three sides. Along with filling of 04 nos cable jointing kits
Repairing of cable trench with cable laying work at Old Sonia Vihar BPS.
Making cable connection by fixing above tube terminals at the end of above laying cables 3 core cables with LT panel/motor by tightening of nut bolt as required and the cable connection should be covered with PVC tape as required.