Loading…
Loading…
60,523 results • Best match
Civil, Plumbing and Electrical Works
ELECTRICAL WORKS WIRING
GENERAL- Non plan work 2025-2026 - Urgent Maintenance work for Fire Quarters Fortkochi under Buildings Section Mattancherry - Electrical maintenance - electrical maintenance- General Electrical Work
Work Name:GENERAL- Non plan work 2025-2026 - Urgent Maintenance work for Fire Quarters Fortkochi under Buildings Section Mattancherry - Electrical maintenance -electrical maintenance-General Electrical Work
DEPOSIT-Airconditioning of Senior AO Room Store -Bill section room CA Room Fair copy section Providing additional Electrification for the Installation for A/C units-General Electrical Work
Providing additional Electrification for the Installation for A/C units in Various sections in Administrative Block at GHMC,KKD
Miscellaneous Electrical Maintenance works such as Erection Repair of Pole Plinth Stay wire Laying Guarding of HT LT Line Conductor Transformer Building Earthing TPMO LA Fuse Unit Installation LT Panel Busbar Brick Soling etc. works of CEMD ATP Anpar
7 Earthing with G.I. earth plate at for residential buildings of ATP Colony, Anpara. 7 300 Nos. 0 Excess(+) Full Conversion INR
e-tender-Harippad Block-Thrikunnapuzha GP-CHC additional Electrical Work-Electrification
90.2.1.1:Supply and wiring points according to IS 732-1989 using rigid PVC conduit of minimum size 20 mm with specials conforming to IS 9537 part III 1983 and with suitable size specials conforming to IS 3419-1988, fixing the conduit using metal saddles spacing not exceeding 50 cm or concealed suitably and with 1.00 sq mm FRLS PVC insulated stranded single core copper conductor cable 650V grade, including providing switch board main and continuous earthing with No.14 SWG bare copper,required quantity of copper earth socket, brass bolt and nut crimping/ soldering etc complete with suitable size modular type metal switch boxes, modular type front plates (white) etc. up to and including 6A modular type SP switches and making good the surface of wall, colour washing etc. complete. All the terminations in the switch boards and DB's shall be tinned and the wires shall be drawn and fixed along the periphery of the box using suitable ties, tie mounts etc as required. (RoHS compliant modular accessories).Single Control light point with 6A, plate ceiling rose - Short point
GENERAL- Govt Secretariat, Tvm- Running Maintenance contract of Electrical Installation in Annex I Annex II Building for a period from 01/10/2025 to 30/09/2026-RMC-General Electrical Work
1.10.3:Wiring for light point/ fan point/ exhaust fan point/ call bell point with 1.5 sq.mm FRLS PVC insulated copper conductor single core cable in surface / recessed medium class PVC conduit, with modular switch, modular plate, suitable GI box and earthing the point with 1.5 sq.mm. FRLS PVC insulated copper conductor single core cable etc as required.Group C