Loading…
Loading…
60,691 results • Best match
Premonsoon maintenance and repair of allied mechanical works and electrical installations such as Relay LT Starter control panel including allied works of inclined pump at Kalagachia ward no142KMC and centrifugal pump at Kabardanga ward no144K
Earthwork in re-excavation / silt clearance in drainage channel in all kindsof soil including sludge, slush mixed with all sorts of industrial wastes andmunicipal garbages, polypacks, carcasses, small khatal effluents, nightsoil etc. by mathor labour as may be necessary and depositing the samein places as directed by the Engineer-in-charge , in such a manner,without causing much hindrance to traffic and posing health hazard and making arrangement to maintain the site in workable condition and roughdressing when dry including making arrangement of bailing out of anyseepage water and removal of sand or soil blown from underneath,removal of khatal, temporary latrines, clearing and removing all kinds ofsemi compact masses formed by water hyacinth, jungles up to 30 cmgirth, and burning them to ashes or removing outside Government land in conformity with the Municipal rules, including shoring shuttering asrequired, nicking out lines etc. (Measurement : Pre-work and Post-work level section. Pre- work sectionto be taken after removal of water hyacinth and all other floating materials etc.) (a) By manual means within an initial lead of 30 M and an initial lift of 1.50 M
REPAIRS TO PLINTH PROTECTION, COLUMNS, WALLS, FASCIA AND BEAMS, SLAB AND OTHER CONNECTED WORKS TO MD OTM ACCN AND UPKEEP/ MAINTENANCE OF ELECTRICAL SUPPLY INSTALLATION , SUBSTATION AND CONNECTED WORKS
Providing & fixing double steel scaffolding system (cup lock type) on the exterior side of the building/structure, including additional rows of scaffolding in stepped manner as per requirement at site, made with 40mm dia MS tube, placed 1.5mtr c/c(Maximum), horizantal & vertical MS tubes jointed with cup & lock system in the scaffolding for working platform etc amd maintaining it in a serviceable condition for execution of work and removing it thereafter. the scaffolding system shall be stiffned with bracings, runners, connecting with building etc wherever required to ensure safety of workmen all as directed by Engr-in-charge. Note:- 1. Area derived by multiplying the outer most external perimeter and height of the building /structure shall be measured for payment. 2. The payment shall be made only once after completion of all external items of work w.r.t the building/structure. 3. After completion of the work the material of the scaffolding shall be the property of the contractor and required to be removed from the site.
Electrical Installation in EB IV 19 and EB IV 20 and sanitary work in EB IV 18 HPSEBL colony Sunder Nagar
eProcurement System Government of Himachal Pradesh Created By: Manish Kumar Created Date/Time: 19-Jun-2026 12:25 PM Tender Title: Electrical Installation in EB IV 19 and EB IV 20 and sanitary work in EB IV 18 HPSEBL colony Sunder Nagar Tender ID: 2026_HPSEB_135737_1
Proposed work for Supplying, Erecting and Commissioning of Additional LT Pole DTC as per requirement and HT pole under 1.3 pe DDF scheme of MSEDCL under Annabhau sathe nagri wasti sudhar yojna at Prabhag 7 Gadchiroli Municipal Council Gadchiroli, Dis
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Office Space; As per scope of work attach, Electrical System or Installation; Service Provider
Electrical System or Installation; Service Provider
Proposed Construction of collectorate Complex at Kalyanpur Housing for the office of the District Magisstrate , Paschim Bardhaman----- External EI work- Sub Station incl allied Electrical works , Compound Lighting Arrangement , S and Installation of