Loading…
Loading…
60,740 results • Best match
Electrical
Electrification
Supplying installation testing and commissioning of Street Light Poles, LED Fittings, Earthing, Feeder Pillar and necessary cabling work at Old MB Road under M-South Electrical Maintenance Division during 2025-26.
Supplying, installation, Testing & Commissioning of Street light LED fixture, powder coated pressure die cast aluminum body with built in or separate driver as per the requirement with Driver efficiency >85%, Input voltage: 140-270 Volt AC, freq 50/60 hz, Operating temp range -15 deg to 50 deg centigrade, internal surge protection of 5 KV L,N,E as per IEC 61000-4-5, Driver efficiency>85%,THD 10% as per IEC 61000-3-2 , P. F.≥0.95, IP-66,IK-10, CRI >80 , under voltage and over voltage protection,EMIEMC as per CISPR-15, lenses for beam angle as per IESNA type I/II/III as per the width of the road and the project requirement., suitable to fit in up to65mm dia pipe, life time (LED,Driver & electrical circuitry) of minimum 50000 Burning Hours with 70% of initial Lumen maintained till life ends as per LM80 extrapolation IES TM-21-11 report , CCT 3000°K /4000°K / 5700°K /6000°K/6500°K (As per ANSI Bin) , SDCM(Standard Deviation Color Matching) 5, Maximum power consumption should not more than the specified rating and Fixture shall be of relevant BIS standard complete in all respect i/c connections with 1.5 sq mm FRLS, PVC insulated copper conductor single core cable and earthing etc. as required with Minimum 5 year OEM warranty. System lumen efficacy >135 lm/Watt output . LM79 & LM80 Test report from NABL lab for all testing required for LED fixtures as per BIS shall be submitted. Shape size and CCT shall be as approved by Engineer-in-Charge as per requirement. (Thermal management: heat sink of aluminum housing such that LED junction temperature shall not rise above 90°C). a) 90W
ARMO of E & M installation at Income Tax Officers quarrters , Oshiwara,Mumbai. SH - Supplying of electrical materials , installation of fans, light fittings & Signage board work
1 ARMO of E & M installation at Income Tax Officers quarrters , Oshiwara,Mumbai. SH - Supplying of electrical materials , installation of fans, light fittings & Signage board work 561344 Above 4.8 588288.512
General Electrical Work
Electrification -Phase II
Custom Bid for Services - Work of loading, unloading laying installation of different accessories for installation of Electrical Equipment Similar Category Manpower Outsourcing Services - Minimum wage
unloading laying installation of different accessories for installation of Electrical Equipment Similar Category Manpower Outsourcing Services - Minimum wage
Civil and Electrical works for Gopalapuram
Labour for laying of cable in duct/ trench/ clamping on structures - neat laying in the ducts with identification tags plastic token in all duct corners for easy identification of cables including fabrication of clamps and fixing at uniform intervals as directed by the field engineer Above 8 Core