Loading…
Loading…
61,029 results • Best match
Repairing and renovation of Electrical Installation Works for Plastic OT at Ground Floor Baker Building under the NRS Medical College and Hospital Kolkata SITC of UPS
Terms and Condition: The Agency mlist procure the materials from the Manufacturer/ OEM or from their authorised sales channel so that the standard warranty/ support of the Manufacturer/ OEM becomes applicable to the products to be delivered and installed by them. Documents that authenticate such procurement from the Manufacturer/ OEM or from their authorized sales channel and standard warranty/ support should be sent from the e-mail of the Manufacturer/ OEM/ authorized sales channel to the e-mail of Engineer-in-Charge and hard copy of it to be submitted during execution, of work/submission of bill.
INSTALLATION OF DECORATIVE LIGHTING ARRANGEMENT WITH ALLIED ELECTRICAL WORKS FOR CITY BEAUTIFICATION AT NIRMAL CHANDRA STREET AND DIFFERENT PLACES IN WARD NO-48, UNDER BOROUGH-V.
2.00 T. S. ELECTRICALS (GSTN-NA) BID ID -7625533 499776.08 0.00 499776.08 Four Lakh Ninety Nine Thousand Seven Hundred and Seventy Six
SUPPLY AND INSTALLATION OF SPLIT AIR CONDITIONING MACHINE WITH ALLIED ELECTRICAL WORKS TO MINIMIZE THE EFFECT OF WATER LOGGING AT IUM BASEMENT TRAINING ROOM UNDER KMC
Tender Inviting Authority: D.G(E) / Lighting and Electricity Department,KMC
Annual Miscellaneous Electrical Maintenance Work.
Engagement of Highly Skilled/ semi skilled /UnSkilled man power (including holidays & Odd hours including night shift as required) for execution of Electrical works and as per the direction of Engineer-in-charge of the work: (Expect the works mentioned above).
Construction of MSSR RCC Antenna SH- Electrical works.
SITC of 3 phase Multi functional meter for measuring Line Voltage, Phase Voltage, Line Current, Frequency, Watts, power factor, VA,Watt hour with RS 485 serial Interface and optically isolated, 50A Clip on CT's, including all other works such as fixing of Multi functional meters in distribution panel by cutting face plate of distribution panel, laying and connection of power cables, supply and laying of Modbus serial communication cables for interconnection between Multifunctional Meters and gateway, connection of CT, wiring etc. compelete as per the site requirement.
DEPOSIT SASCI Construction of Smart Village Office building for Thavinjal village -Electrification-General Electrical Work
1.10.2:Wiring for light point/ fan point/ exhaust fan point/ call bell point with 1.5 sq.mm FRLS PVC insulated copper conductor single core cable in surface / recessed medium class PVC conduit, with modular switch, modular plate, suitable GI box and earthing the point with 1.5 sq.mm. FRLS PVC insulated copper conductor single core cable etc as required.Group B