Loading…
Loading…
61,781 results • Best match
GENERAL-Balance work for the construction of a new building block for Govt.HS Anappara , Vithura-Electrical work-General Electrical Work
LAC-ADS-2023-24 Kalliasseri LAC Sri Vijin MLA - Renovation of Edatt Parambath Pond- Providing Decorative Lighting for Edatt Pond- General Electrical Work
90.14.1.2:Fabrication, supply, conveyance, installation testing and commissioning of floor or wall mounting, dust and vermin proof, cubicle type MV panel board comprising of the following components/ devices & complying to IS 8623. Fabrication of fully partitioned, dust and vermin proof enclosure for panel assembly as per form 4 of IS 8623 (with latest amendments) using CRCA sheet as per approved design and requirement, with front and rear access facility, bus bar chambers, hinged doors for all switch gear compartments, earthing the doors using 4 sq mm braided copper conductor, providing necessary cut-outs for mounting meters, relays, indication lamps, bus bar interconnection etc, detachable covers for bus bar chamber and cable alley, powder coating the assembly after subjecting to 7 tank process etc as required. CRCA sheet alone be used for the fabrication. Angles/ flats/ slotted angles etc shall not be used for the fabrication of panel assembly. The measurments will be taken the area of the complete sheets used for panel board including partitions, folding, shrouding etc.Supply and fabrication of MV panel board using 1.6mm CRCA sheet, powder coated (excluding base frame)
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Commercial; Electrical System or Installation, Additional 11 KV DTR Installation Works under Business Plan Year 2026-27 against tender no 22 2026-27; As per BOQ
and Installation of Plant Systems/Equipments (Version 2) - Commercial; Electrical System or Installation
Annual Plan-TC-Ayyanthole, Tagore Hall Electrification Lift-S1967/25 Part-B Electrical Lift Work
OD454380/2024-2025:Supply, providing, laying/fixing of polished granite stone on wall in required design and patterns, in linear as well as curvilinear portions on walls in front of lift door, all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 91 cement : 4 coarse sand)fixed and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade, including rubbing curing and polishing etc. all complete as specified and as directed by the Engineer in charge. Polished Granite stone slab jet black, Cherry red, Elite brown, Cat eye OR equivalent.
Improvement and Development of ward Block i.e. changing of doors, windows, repair of damage of tiles, Plaster works of inside and Outside/ Coridor along with complete white wash of inner and outer surface with electrical work in HRH
LED Batten light (System lumen efficacy ≥105 120 lm/Watt) Supplying, installation, Testing &Commissioning of LED surface mounted Batten light of following body material and construction as per IS : 10322 with driver (Replaceable) as per the requirement with Driver efficiency >85% ,Operating voltage AC 140-270 Volt, freq 50/60 hz, Operating temp range -15 deg to 40 deg centigrade, internal surge protection of 2.5 KV with Short & Open circuit protection ,THD 10% , P. F.≥0.95, IP20, CRI >80, Flicker free, (flicker should be below 5 %), life time (LED,Driver & electrical circuitary), of minimum 50000 Burning Hours with , 70% of initial Lumen maintained till life ends, CCT 3000°K / 4000°K / 5700°K /6000°K/6500°K (As per ANSI Bin),SDCM(Standard Deviation Color Matching) 3, Maximum power consumption should not more than the specified rating and Fixture shall be of relevant BIS standard and trade mark certificate ( T.C.). Manufactures Word Mark/ Name Engraved/ Embossing/ Screen printing on housing. complete in all respect i/c connections with 1.5 sq mm FRLS, PVC insulated copper conductor single core cable and earthing etc. as required with Minimum 5 year OEM warranty. System lumen efficacy ≥105 120 lm/Watt output . LM79 & LM80 Test report from NABL lab for all testing required for LED fixtures as per BIS shall be submitted. Shape size and CCT shall be as approved by Engineer-in-Charge as per requirement. (Thermal management: heat sink of aluminum housing such that LED junction temperature shall not rise above 90°C). Powder coated die cast / Extruded aluminium Body (Thickness ≥ 1.20 mm) 18-22 watt
INSTALLATION OF NEW LED STREET LIGHT AND ALLIED ELECTRICAL WORK AT SAHID BINOY BOSE ROAD, JANATA ROAD SURROUNDING AREA IN WARD NO-104 BRXI
Tender Inviting Authority: The Executive Engineer (Electrical),Lighting Z-IV; BR. XI, KMC