Loading…
Loading…
62,197 results • Best match
SUPPLY AND INSTALLATION OF WATER COOLER CUM PURIFIER MACHINE ALONG WITH OTHER NECESSARY ELECTRICAL WORKS AT SHYAMBAZAR STREET NEAR PETROL PUMP IN WARD NO-09 UNDER BR-1
Annual Plan-Malappuram District Panchayath Palapety para Anganwadi Completion and electrification Peruvalloor-201/26-General Electrical Work
1.10.3:Wiring for light point/ fan point/ exhaust fan point/ call bell point with 1.5 sq.mm FRLS PVC insulated copper conductor single core cable in surface / recessed medium class PVC conduit, with modular switch, modular plate, suitable GI box and earthing the point with 1.5 sq.mm. FRLS PVC insulated copper conductor single core cable etc as required.Group C
GENERAL Palakkad Municipality 2025 26 Project No 344 26 Construction of Aspiration toilets Electrification General Electrical Work
1. Electrification.
Electrical works for Central Dining Hall-3 at IISER, Thiruvananthapuram
Supplying, Installation, Testing & Commissioning of LED surface mounted Batten light of following body material and construction as per IS : 10322 with driver (Replaceable) as per the requirement with Driver efficiency >85%, Operating voltage AC 140- 270 Volt, frequency 50/60 hz, Operating temp range -5 °C to 40 °C, internal surge protection of 2.5 KV with Short & Open circuit protection, THD 10%, P.F.≥0.95, IP20, CRI >80, Flicker free, (flicker should be below 5 %), life time (LED, Driver & electrical circuitry), of minimum 50000 Burning Hours with 70% of initial Lumen maintained till life ends, CCT 3000°K / 4000°K / 5700°K /6500°K (As per ANSI Bin), SDCM(Standard Deviation Colour Matching) 3, Maximum power consumption should not more than the specified rating and Fixture shall be of relevant BIS standard. Manufactures Word Mark/ Name Engraved/Embossing/ Screen printing on housing. complete in all respect i/c external connections with 1.5 sqmm FRLS/HFFR, PVC insulated copper conductor single core cable and earthing etc. as required with Minimum 5 year OEM warranty. System lumen efficacy ≥105 120 lm/Watt output . LM79 & LM80 Test report and all testing required for LED fixtures as per BIS shall be submitted. Shape size and CCT shall be as approved by Engineer-in-Charge as per requirement. (Thermal management:heat sink of aluminium housing such that LED junction temperature shall not rise above 90°C).
PROJECT NO 18- 2025-26-ELECTRIFICATION COMPLETION OF RRF BUILDING AT VORKADY GRAMA PANCHAYATH -GENERAL ELECTRICAL WORK
1.10.3:Wiring for light point/ fan point/ exhaust fan point/ call bell point with 1.5 sq.mm FRLS PVC insulated copper conductor single core cable in surface / recessed medium class PVC conduit, with modular switch, modular plate, suitable GI box and earthing the point with 1.5 sq.mm. FRLS PVC insulated copper conductor single core cable etc as required.Group C
Annual Plan Kottamonpara SC Community Hall Electrification Project No S0116 26 of Seethathode Grama Panchayat General Electrical Work
Annual Plan-Kottamonpara SC Community Hall Electrification-Project No. S0116/26 of Seethathode Grama Panchayat-General Electrical Work