Loading…
Loading…
62,457 results • Best match
Construction of 2B Plus G Plus 6 storied Regional Cancer Center within the compound of Medical College Hospital Kolkata Electrical Installation Work SITC of UPS
Special Terms and Conditions 1. It is stated that the above work place is existing COVID Hospital, In case of any mishap or accidental to any staff that deputed by the agency the whole responsibility is to be borne by the concern agency. 2. The Agency shall be responsible for provisioning of all COVID safety measures including regular sanitiziation of work places, vaccination of employees and compliance of stated directive and COVID appropriate norms. 3. All the issues related to the safety of the staffs should be taken care by the agency itself. (Rate should be quotated including all taxes and duties)
ELECTRICAL INSTALLATION OF BOHD CHARGING SYSTEM AND NECESSARY WIRING,LIGHTS, FANS ETC WORKS AT WARD 17 AND 105 IN BR-II AND BR-XII RESPECTIVELY UNDER SWM DEPARTMENT KMC.
Facility Management Service- Manpower based (Version 2) - Industrial; CLEANING & SANITATION WORK, ELECTRICAL MAINTENANCE WORK AND PLUMBING WORK; Semi-skilled, ELECTRICAL MAINTENANCE WORK AND PLUMBING WORK; Skilled
GENERAL Electrical Maintenance Work in IMCH at Ward-54 Verandah Casualty Main Entrance MNCU Bystanders Waiting Area Infront of 19 ICU etc at IMCH KKD-General Electrical Work
Work Name:GENERAL-Electrical Maintenance Work in IMCH at Ward-54 Verandah, Casualty Main Entrance, MNCU Bystanders Waiting Area, Infront of 19 ICU etc. -at IMCH, KKD-General Electrical Work
Maintenance of various monoblock ,submersible pumps and allied electrical works
Wiring for light point/ fan point/ exhaust fan point/ call bell point with 1.5 sq.mm FRLS PVC insulated copper conductor single core cable in surface / recessed medium PVC conduit, with piano type switch, phenolic laminated sheet, suitable size MS box and earthing the point with 1.5 sq.mm. FRLS PVC insulated copper conductor single core cable etc as required.Group C
Retender GENERAL-CHIRAYINKEEZHU LAC ELECTRIFICATION FOURTH PHASE AT PREM NAZIR SMARAKA BUILDING IN CHIRAYINKEEZHU GP ELECTRIFICATIONGeneral Electrical Work
1.55.1:Wiring for group controlled (looped) light point/fan point/exhaust fan point/ call bell point ( without independent switch etc.) with 1.5 sq. mm FRLS PVC insulated copper conductor single core cable in surface/ recessed PVC conduit, and earthing the point with 1.5 sq. mm FRLS PVC insulated copper conductor single core cable etc. as required.Group A