Loading…
Loading…
62,537 results • Best match
Premonsoon maintenance and repair of electrical installations such as ACB MCCB LT Starter control panel including allied works of 2nd Additional Chowbhaga Pumping Station at Paschim Chowbhaga PS Anandapur District South 24 Parganas during the
Finishing the end of following XLPE/ PVC Armoured Cable by Criping method including S&F Solderless Socket (Dowels Make) Tapes, anticorosive paste and jointing materials. 3.5 core 150sqmm cable
Premonsoon maintenance and repair of electrical installations such as ACB MCCB LT Starter control panel including allied works of Chowbhaga Pumping station at Paschim Chowbhaga PS Anandapur District South 24 Parganas during the year 202627
Laying of one No. cable upto 35 sqmm in underground trench 460 mm wide x 760 mm average depth, with brick protection on the top of the cable with 8 (eight) Nos. bricks per metre, including filling the space between the brick & cable and also the trench with shifted soil, leveling up and restoring surface duly rammed
REPAIRING OF ELECTRICAL WIRING AND ALLIED ELECTRICAL WORKS AT THE NEW ALIPORE MARKET COMPLEX UNDER BR-X.
Providing Architectural and Engineering Consultancy Service for Construction of A-Type School Building Two Sections, 09 Nos Staff quarters Type-III 08 Nos Type-V01 No., Ramp, Boundary wall, and Other Amenities including Internal Water Supply, ... Sanitary Installation Internal ... Internal Electrical Installation, ... Electrical Installation , ... Civil Electrical development ... development works for ...
Electrical and Allied works for Shop ABC at Mahasu Devta Hanol
Supply, connection, testing and commissioning of heavy duty, medium voltage, XLPE (IS 7098 - PART-II) insulated, Stranded AL / Cu conductor Armoured / Flexible cables as per specification & IS. The cable shall have outer sheeth of XLPE and inner sheath of PVC with stranded AL conductor wherever specified. The cable shall be laid underground in excavated trench / prepared trench / hume pipes when laid outside the building. Cable shall be laid throught preapred trench / cable tray / duct / hume pipe / channel / floor trunks etc when laid inside the building as instructed by PMC/Site Incharge. The scope shall include: 1) Supply of Cables.(With Non Returnable Drums) 2) Delivery of the cables at site. 3) Unloading at site store. 4) Shifting of cable from site store to place of installation. 5) Connection of cable with proper tagging as specified ni specifications. 6) Supply & fixing of cable clamps, brackets, supports, route markers etc. where ever required to fix the cables safely. 7) Earthing the glands and armouring with earthing clamp and jumper and also connecting to common earth bar. 8) Testing of insulation and continuity of cable and submission of reports to the client's representative. 9) To prepare submission drawing and to take approval of consultant at each stage. 10) To prepare & submit as-built drawing and handing over document to end user. 11) Rate shall be inclusive of route markers at 15mtr intervals 12) Each run of cable to be tested with 1KV meggar 13) Proper cables tags of Aluminium shall be made and feeder shall be written.
Annual Plan-S0316/26 CHUNDILECHAL ANGANWADI FIRST FLOOR ELECTRIFICATION-at Kalliyasseri DP, Kalliyassei Block-General Electrical Work(Retender)
90.14.1.2:Fabrication, supply, conveyance, installation testing and commissioning of floor or wall mounting, dust and vermin proof, cubicle type MV panel board comprising of the following components/ devices & complying to IS 8623. Fabrication of fully partitioned, dust and vermin proof enclosure for panel assembly as per form 4 of IS 8623 (with latest amendments) using CRCA sheet as per approved design and requirement, with front and rear access facility, bus bar chambers, hinged doors for all switch gear compartments, earthing the doors using 4 sq mm braided copper conductor, providing necessary cut-outs for mounting meters, relays, indication lamps, bus bar interconnection etc, detachable covers for bus bar chamber and cable alley, powder coating the assembly after subjecting to 7 tank process etc as required. CRCA sheet alone be used for the fabrication. Angles/ flats/ slotted angles etc shall not be used for the fabrication of panel assembly. The measurments will be taken the area of the complete sheets used for panel board including partitions, folding, shrouding etc.Supply and fabrication of MV panel board using 1.6mm CRCA sheet, powder coated (excluding base frame)