Loading…
Loading…
65,602 results • Best match
Calibration Services - Electrical; AS PER SCOPE OF WORK; NABL Labs; Lab
Calibration Services - Electrical; AS PER SCOPE OF WORK; NABL Labs; Lab
GENERAL-Revamping and standardisation of Existing Fire Fighting System at medical college Hospital -A to E blocks 400 Bedded Ward J1J2J3 block and Surgery Block- Thrissur-Phase 2-Electrical work-General Electrical Work
electrification
ESSENTIAL ELECTRICAL WORKS TO ASSURE MINIMUM FACILITIES FOR ENSUING LEGISLATIVE ASSEMBLY ELECTION 2026 UNDER BR-XII.
... switch board with Perspex/bakelite top cover on wall incl. necy. connections and making earthing attachment and mending good damages to building works. [PVC casing-capping and Switch board both on surface) Average run 8 mtr
Improving Disaster Resiliency of lifeline building of Govt. Senior Secondary School (Boys)at Nagrota Bagwan in Distt. Kanga (H.P).(SH Dismantling , Demolishing Retrofitting work in unit-I and unit-II ). Estimate for the installation of electrical por
Wiring for light point/ fan point/ exhaust fan point/ call bell point with 1.5 sq.mm FRLS PVC insulated copper conductor single core cable in surface / heavy class PVC conduit having wall thickness minimum 2 mm, with modular switch, modular plate, suitable GI box and earthing the point with 1.5 sq.mm. FRLS PVC insulated copper conductor single core cable etc as required.
Custom Bid for Services - Increasing capacity of Transformer & Installation of New Transformer in the area of EE, EDD Lalitpur/Mehroni under Business Plan 2026-27 (T-06) Similar Category Operation and Maintenance Of Electrical Systems/Electrical ... Systems/Electrical Installation s
EDD Lalitpur/Mehroni under Business Plan 2026-27 (T-06) Similar Category Operation and Maintenance Of Electrical Systems/Electrical Installations
Improvement / Development of CCU part 2 with Electrical work in Hindu Rao Hospital
LED Panel light 2x2 ft. (System lumen efficacy ≥105 120 lm/Watt) Supplying, installation, Testing & Commissioning of Panel light 2x2 ft., of following body material and construction... Glare Rating) 19, Flicker free, (flicker should be below 5 %), life time (LED, Driver & electrical circuitry), of minimum 50000 Burning Hours with, 70% of initial Lumen maintained till ...