Loading…
Loading…
584 results • Best match
Construction of Prefabricated/ Pre-engineered PORTA cabin on EPC (Engineering Procurement and Construction) basis at central Jail Katihar for the Year 2026-27 Gr02
The detector must provide audio and visual
Construction of Prefabricated/ Pre-engineered PORTA cabin on EPC (Engineering Procurement and Construction) basis at central Jail Purnea for the Year 2026-27 Gr01
The detector must provide audio and visual
Annual Rate Contract for Supply of Stationery Items at Nagaon Medical College
12 V Replacement Battery for UPS (26 Ah)
Event Management
Complete Sound System with JBL speakers Power Backup, Podium mike, Electrical Work,
Construction of Prefabricated/ Pre-engineered Pota cabin in Jail on EPC (Engineering Procurement and Construction) basis at Muzaffarpur Central Jail, Hajipur Divisional Jail and Sitamarhi, Divisional Jail. (Total no of Cabin = 03 Nos)
The detector must provide audio and visual
Shifting of Secondary substation at workshop to Frere Basin
Supply of UPS with Battery Supply of 600VA UPS system along with SMF-VRLA battery conforming to JISC-8702 Pt 1 2 and 3 with single phase 230V AC 50Hz output for E-House emergency illumination complete with all accessories