Loading…
Loading…
6,149 results • Best match
R/f Anasagaram to Pammi (upto Mandal limits) of Nelakondapalli Mandal, Khammam District, Est.Cost Rs.280.00 Lakhs
Supplying, fitting and placing of HYSD bars Fe-500 ( From Primary producers ,Like TATA,SAIL,VSP, JWS & Shyam steel Etc.,) of different diameters, wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., and including over lapping welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 &2200 (5th revision) in sub-structure.
Improvements to Existing BT Road from Ravinuthala to Govindapuram via Peddabeeravalli of Bonakal Mandal,Khammam District,Est Cost Rs. 280.00 Lakhs
Supplying, fitting and placing of HYSD bars Fe-500 ( From Primary producers ,Like TATA,SAIL,VSP, JWS & Shyam steel Etc.,) of different diameters, wrought and put up bars of all diameters including cost and conveyance of steel to site and all labour charges for fabrication of reinforcement including cutting, bending, binding rods, tying grills, placing them in position etc., complete including cost and conveyance of binding wire and all handling charges and operational charges etc., and including over lapping welding if required etc., complete for all R.C.C items for finished item of work as per standard drawings, as per the directions of the Engineer-in-Charge and as per MoRT&H specification 1600 &2200 (5th revision) in sub-structure.
Erection of Varandah Shed to stop splash of rain to the lawn of Ante Natal Ward of Bishnupur District Hospital, Bishnupur under Bishnupur Division P.W.D. in the District of Bankura during the year 2026- 2027
M.S. structural works with hollow sections conforming to IS: 806-1957 & IS:1161-1958 connected to one another with bracket, gusset, cleat as per design, drawing & direction of Engineer-in-Charge complete including cutting to requisite shape & size, fabrication including metal arc welding conforming to IS: 816-1956 & IS: 9595 using electrodes of approved make and brand conforming to IS:814-1957, haulage, hoisting and erection all complete. The rate includes the cost of all M.S. Hollow section, all consumables such as electrodes, gas and hire charges of all tools and plants and labour required for execution and all incidental chages (such as electricity, labour insurance) etc. complete. Payment to be made on the basis of calculated weight of structural memebrs of MS Holow Section as specified in relevent IS code in finished work. Payment for gusset, bracket, cleat may be made by adding the actual weight of such items with weight of finished structural members. The rates are considered for a night of erection 8 m./ 2nd floor level from the ground. Add 1.5 % extra over the rate for each additional floor or 4m. beyond the initial 8 m. or part thereof.
Providing, Installation, Testing and Commissioning of Submersible Pump set 01 No. having specification 20000 GPH X 120 Mtrs head each along with allied works at T/well Poonch Colony under JMC Capex (New Works) 2026-27.
Providing, Installation, testing and commissioning of 1no. submersible pump set having specifications 20000 GPH x 120 Mtrs. head each along with allied works at Tube Well Poonch Colony. Fabrication and fitting of U-shaped tie rod/clamp which is to be fabricated out of MS flat to be fitted with submersible pump by fabrication and fitting of bolts and nuts which are to be welded on both sides of the clamp. The job also includes fabrication of expander/reducer nipple for NRV of required size which is to be fabricated out of MS plate threaded at one end flanged at the other end. Fitting of reducer/expander nipple to be fastened with column pipe at one end with flange joint and with the discharge outlet (NRV) of the submersible pump at the other end. Coupling of submersible pump-set and shifting to site of work. Extracting the already lowered pump set along-with column pipes cable and all necessary elements. Lowering the new submersible pump motor set, calibration of panel, testing and commissioning of submersible pump set at site. The complete job includes cost of materials i.e. submersible pumpset, flanges, nuts, bolts, rubber sheets and labour charges. Job also includes P/F of connectors 110 Amp- 2 No.s for repairing of LT Control Panel also includes P/F of Main switch 250 Amp with necessary cables. Complete job
Construction of Bridge across the Dalai River on the Road from Hayulaing Chaglagam BRO Road (Chipru) to Kalabro, Span-80.00m
Supply and fabrication of steel work at fabricators workshop comprising of main griders, cross griders connecting plates, stringers,stiffening plates etc from structural steel of specified grades as per approved drawing including straightening, decaling, cutting to size and shape drilling welding and grinding supply of all MS/HTS shop or site bolts nuts washers, holding down bolts and assembling at workshop one priming coat of shop paint with red lead paint conforming to IS-102 with all labour material cost of paints stacking in protected condition etc omplete as per specification and as directed by the Engineer in charge (Carriage cost from fabricator workshop to actual bridge site will be paid separately).
Construction of Bridge across the Dav River on Hayuliang Goiliang PWD Road (Gamliang) to Keletong (Span-50.00m).
Supply and fabrication of steel work at fabricators workshop comprising of main griders, cross griders connecting plates, stringers,stiffening plates etc. from steel plates and structural steel of specified grades as per approved drawing including straightening, decaling, degreasing cutting to size and shape drilling welding and grinding supply of all MS/HTS shop or site bolts nuts & washers, holding down bolts and nuts etc. trail assembling at workshop one priming coat of shop paint with red lead paint conforming to IS-102 with all labour material cost of paintsconsumables stacking in protected condition etc omplete as per specification and as directed by the Engineer in charge (Carriage cost from fabricator workshop to actual bridge site will be paid separately)