Loading…
Loading…
6,482 results • Best match
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; FABRICATION AND ERECTION WORKS AS PER ATC; Buyer
and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; FABRICATION AND ERECTION WORKS AS PER ATC; Buyer
E-tender for labour charge for Fabrication work of various line item at all sub-division under Palanpur Division-1
Fabrication of Tub Trolley Chassis, Rectangular shape tub and Complete assembling 40Cft Capacity Tub Trolley 15 Nos for Gumgaon Mine
Design, analysis, fabrication, supply and installation of modular pin storage racks as per technical specification at FRFCF site, NRB, Kalpakkam
Design, fabrication and supply of P11 pin storage racks framework (without lead shield and HDPE tubes) of size 3.6 m x 2.4 m x 3 m as per drawing-1
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Fabrication Of Boiler in Sugar Mill; Service Provider
and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Fabrication Of Boiler in Sugar Mill; Service Provider
Fabrication and installation of Kort Nozzle of vessel MPT Rajguru at Kolkata/Howrah (NW-1) for the FY 2026-2027
Scope of Work: Fabrication and Installation of New Kortz Nozzle (Starboard Side) and Renewal of Propeller Seals 1. General Description: The work includes fabrication, supply, and installation of a new Kortz Nozzle on the Starboard side, to be integrated with the HRP Propulsion Unit, Type 2111 WM. 2. Material & Construction: i) The Kortz Nozzle to be fabricated from marine-grade steel of equivalent composition, scantling, and hydrodynamic design as that of the Port side Kortz nozzle. ii) All fittings, supports, appendages, stainless steel (SS) fasteners, and sacrificial anodes shall be provided as per standard marine practice. iii) Nut bolts to be tack-welded at the ends to prevent slackening during vessel operation. 3. Propeller Seal Renewal: i) Renewal of propeller shaft seals on the Starboard side HRP unit as per manufacturer’s recommendation and class requirements. ii) Ensure proper alignment, seating, and sealing integrity post-installation. 4. Surface Preparation & Coating: i) Complete surface preparation by sand/grit blasting to Sa 2½ standard or equivalent. ii) Application of anti-corrosive marine coating system, including primer, intermediate, and finishing coats, suitable for underwater service. 5. Inspection & Supervision: i) All works to be carried out under the supervision of IRS/IWT Surveyor and as directed by the Engineer-in-Charge (EIC). ii) Dimensional checks, weld inspections, and coating thickness measurements to be carried out as per classification and marine standards. iii) Cost of fabrication of new Kortz Nozzle including all cost i.e transportation, materials, taxes etc except GST