Loading…
Loading…
6,356 results • Best match
Ext of HT LT line inc. installation of 1x200 KVA DTR to Govt. Degree College Gondatwisa under ESD-GNT
Fabrication of Cross Arms by MS Channel/MS Angle as per specification
Reconstruction of SWD at Mariamman Kovil Street Opposite to Drinity Hotel in ward No - 52 East Zone
Reinforced Cement Concrete 1:1.5:3, one part of cement, one and half parts of sand , three parts of 20 mm hard blue granite metal by volume, characteristic strength not less than 20 N/sqmm) machine mixed for all reinforced Cement Concrete works, including scaffolding, cost of all materials, machine mixing, vibrating, lifting, curing, labour charges for laying & finishing etc., but excluding the cost and fabrication of reinforcements and also excluding centering and formwork etc., complete complying with the relevant standard specifications at all leads inside the building. ( CCMC 2025-26, Pg -05 s.no -17 )
Reconstruction of Culvert at Damodarasamy Layout AND Vettaikaran Kovil Street in ward No - 54 East Zone
Reinforced Cement Concrete 1:1.5:3, one part of cement, one and half parts of sand , three parts of 20 mm hard blue granite metal by volume, characteristic strength not less than 20 N/sqmm) machine mixed for all reinforced Cement Concrete works, including scaffolding, cost of all materials, machine mixing, vibrating, lifting, curing, labour charges for laying & finishing etc., but excluding the cost and fabrication of reinforcements and also excluding centering and formwork etc., complete complying with the relevant standard specifications at all leads inside the building. ( CCMC 2025-26, Pg -05 s.no -17 )
Construction of 03 Nos. Limited Height Subways (LHSs) of size 1 x5.0x5.0 M RCC Box at Km. 158.794 (Shifted location) in lieu of LC No. C-130 at Km. 158.669, at Km. 156.530 (Shifted location) in lieu of LC No. C-129 at Km. 156.800 between Bathinda Cantt. & Bhuchchu Railway Stations and at Km. 148.808 (Shifted location) in lieu of LC No. C-124 at Km. 149.158 between Lehra Mohabbat Railway Stations on Bathinda-Dhuri section of Ambala Division by Normal Pushing Method using Protection Plate Arrangement (PPA) including approaches and other allied works.
Casting single/twin RCC box of all sizes with or without common web section including design of pushing scheme, thrust bed, casting of all RCC components, with specified grade of controlled concrete, pushing it in correct position and alignment below Railway track/Road following all measures of track safety by 'Box pushing technique" as per approved drawings/scheme, with or without surcharge in all types of soils with disposal of surplus earth away from vent up to 1 Km, fixing arrangement for all services & utilities including parapet walls on both sides, wearing course, foot paths, plaques, drainage arrangements etc. and all other incidental works to complete the ROB/RUB/Canal crossing in all respect as per specifications to the satisfaction of Engineer-in-Charge. N o t e : 1. The rate includes all items of work/supplies for complete job in all respects except "cost of Reinforced cement concrete, cement, reinforcement & shuttering" of (i) main RCC Box; (ii) Thrust Bed; (iii) Footpath (iv) Parapet wall and (v) wearing Course only, which shall be paid extra under relevant items of USSOR. 2. In case Drag Sheet and/or Rail Cluster are to be used as per approved scheme and design, the same shall be paid extra under relevant item. 3. The payment for this item shall be made for the clear inner cross section area of the parent RCC Box/Boxes and barrel length i.e. clear inner volume of parent RCC Box/Boxes. Total 11700768.28 Item- 4 Chapter-4 Bridge Works-Super Structure (Steel) S No. Item No Description of Item Unit Qty Rate Amount DYCE-C-1-UMB-ENGINEERING/NORTHERN RLY Supplying, fabrication, assembling of all types of steel girders of specified spans with structural steel conforming to Quality "B0" Grade Designation E 2 5 0 conforming to IS:2062, erection / slewing / end launching of steel girders with cranes or any other approved launching methods as per site conditions (not requiring traffic block) on sub-structure including provision of trolley refuges etc., complete as per approved Q A P and drawings conforming to IRS-B1- 2001 and other relevant codes and specifications. Note: 1. Detailed fabrication and erection drawings & launching methodology will be prepared by the contractor and got approved from Railway. 2. The rate is all inclusive including launching in position, complete in all respect except cost of (i) Painting / Metalising; (ii) Bearings & (iii) HSFG bolts which shall be paid extra under relevant item. 3. The payment shall be made on the theoretical weight of main components and gusset plates o n l y. 4. Payment Schedule: (i) Receipt of material at site: 40% (ii) Fabrication of girders: 20% (iii) Erection/Launching: 20% (iv) Completion in all respects: 20%
Pratapnagar Workshop - Improvement of Sheds.
Designing. providing, fabricating. painting. MT transporting, erecting and securing in position structural steel work including Holding Down MS Bolts for pre-engineered building and workshops complete as per specifications, approved shop drawings and / or instructions. Work under this item would generally cover all structural steel Work in the Buildings Workshops, including all but not being limited to, columns, stanchions, beams, rafters, purlins, canopy, steel work for cladding & louvers above 3.50m high from floor level, gantry girders, bracings, catwalk, ladders & stairs inside & outside, provision for fixing Electrical, Mechanical and S & T equipment. All structural steel shall be supplied painted as per specification of the painting as per Clause 2.0 of Specifications for PEB in Chapter -10 Work includes all intermediate VADODARA DIVISION-ENGINEERING/WESTERN RLY stages of activities not defined herein, but otherwise implied for completion of work under this Cost include but not be limited to, all materials including wastage, booths umbels, fasteners of all types for work, temporary and permanent stages of all temporary stays, labour., temporary Works including staging. Scaffolding, tools, plant and costs of all incidentals and necessary testing of material, workmanship etc. including cost of painting as per specifications Note: The above description of item includes the cost of 1) Designing. providing and fixing of rain water gutters and down take pipe of 0.50 TGT pre-painted Galvalume/Zinacalume steel in approved colour all along all edges of the building based on the available surface area and rainfall data. 2) Provision of ventilation system including designing, supply and fixing at required location for 600mm throat edge ventilators along ridge for full length of the shed with required numbers of 600mm diva Turbo vents shall be provided on both side slopes to achieve minimum 5 (five) air changes per hour as per the design approved by Railway. 3) Planning and providing architectural and engineering drawings with all details of Workshop including facade, plan, elevation, section, details of gantry girders & crane rail to suit installation of EOT crane, details of roofing. wall cladding. rolling shutters, flooring, cable duct, water supply, drainage, doors, windows, grills, louvers etc as per requirement of individual shed in consultation with Engineer - in - charge. 4) Designing and providing detailed drawing of Foundations, columns, tie beams & beam/plinth beam duly proof checked by IIT approved by Railway and Designing and providing detailed drawing of flooring, cable ducts, drains, water supply, cubicles, embedded tracks, gas pipe line, roofing, solar light pipe & polycarbonate sheets, wall cladding. industrial flooring, etc as per requirement of individual shed in consultation with Engineer - in- charge. The payment for actual executed quantities of PCCIRCC for foundation & all other items upto Pedestal top will be made separately in relevant items). 5) Designing and providing complete structural, fabrication and erection details drawing of all Pre- Engineered Structures duly proof checked by IIT approved by Railway. 6) Designing. fabricating. providing. Holding Down MS Bolts including all assemblies and accessories that are embedded in concrete work under scope of this work. Bolts shall be of sufficient length to ensure that a minimum 40mm length of threaded portion is embedded in concrete. Threaded portion to be left projecting outside the concrete surface shall be as per requirement of suppliers design and approved drawings.... VADODARA DIVISION-ENGINEERING/WESTERN RLY
Annual maintenance of Sri Sowmyanatha Swamy Temple at Nandaluru, Annamaiah District for the year 2026-27
Supply and fixing of stainless steel SS 304 grade tubes, sections, plates, sheet and pipes of all sizes and diameters, including cost and conveyance of all materials and labour charges for fabrication of stainless steel railing works using SS welding rods including buffing, polishing lacquer finishing to present seamless finishing etc., completed as directed during execution.