Loading…
Loading…
6,579 results • Best match
AS PER BOQ
Development and stabilization of tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5.00 m length each and M.S. angle 40mm X 40mm X 6mm and M.S. plate 10 mm thick with 2 nos. cement concrete blocks of size 1.00 m X 1.00 m 1 no. each at both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge
AS PER BOQ
Development and stabilization of tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5.00 m length each and M.S. angle 40mm X 40mm X 6mm and M.S. plate 10 mm thick with 2 nos. cement concrete blocks of size 1.00 m X 1.00 m 1 no. each at both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge
Installation of air conditioning machines at main office of the Divisional Commissioner, Burdwan Division
Supplying, fabrication & fixing 2 Nos. M.S u-channel of 6 mm thick of size (75 mm x 40 mm x 40 mm) of 1m. length for making Base frame for installation of AC ODU incl. drilling 2 nos holes in each channel including cutting holes into the wall & grouting the same with cement concrete (1:1 ½ :3) etc. fabricated with 2 Nos. horizontal angle of 50 mm x 50 mm x 6 mm of 1.5m length as per direction of E.I.C incl. Platform. [NS]
Deep Drilling, Development and Stabilization of Tube well upto 300 meters Below Ground Level by Direct Rotary/Reverse Rotary/Dual Rotary Method on EPC Mode At JDA Land Transport Nagar in District Jammu under SASCI
Development and stabilization of tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5.00 m length each and M.S. angle 40mm X 40mm X 6mm and M.S. plate 10 mm thick with 2 nos. cement concrete blocks of size 1.00 m X 1.00 m 1 no. each at both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge
AS PER BOQ
Development and stabilization of tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, including disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories etc. Fabrication providing/fitting of steel supporting structure for clamping of tube well housing using two number parallel ISMB-250 of 5.00 m length each and M.S. angle 40mm X 40mm X 6mm and M.S. plate 10 mm thick with 2 nos. cement concrete blocks of size 1.00 m X 1.00 m 1 no. each at both ends. The job includes well capping after yield test in presence of the representative of the department. all, as per direction of Engineer-in-charge
Construction of wall Interlocking tles and paint work in Park Moh Dungarpur ward no-22 Rampur
Mild steel of iron of samll size and section such as holding down bolts hold fast road,grathings etc of fabrication of hold fast nosing hold fast including bending for proper completion of the work