Loading…
Loading…
6,124 results • Best match
FABRICATION AND FIXING OF STEP ASSEMBLY WITH FLEXIBLE LADDER ON 20 TWENTY NOS DUMPERS ie 07 NOS CAT 100TE DUMPERS 05 NOS BH100 DUMPERS AND 08 NOS CAT 190TE DUMPER OF RAJMAHAL PROJECT
Supply, installation, testing and commissioning of 5.5TR capacity Five star split AC along with modification/fabrication/insulation works required for mounting of the new AC unit for LCI unit at YCCPP plant, Yelahanka
Fabrication of MS floor stand for new indoor AC unit and duct work container sheet fabrication opening & closing
Construction of New record room, Providing & fixing aluminium Partition, Colour work, Flooring,, cupboard shutter,marbel shelf, widow curtain, fabrication,electrification work, etc at account and HR section at Achhalia’ AM Division office under bharuch tr circle office.
marbel shelf, widow curtain, fabrication, electrification work, etc at account and HR
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Power House Equipment, Repairing/Rectification fabrication & machining of miscellaneous items required for BMD-II, TMD and EMD-I, 2x210MW, BTPS, PTPP, Pari..
Repairing/Rectification fabrication & machining of miscellaneous items required for BMD-II
Custom Bid for Services - Fabrication of bottom feed sump and stiffness of feed gate enclosure plate during overhauling of unit 4 of 210MW BTPS Parichha Similar Category Operation and Maintenance Power House/Power Plant
Custom Bid for Services - Fabrication of bottom feed sump and stiffness of feed gate enclosure plate during overhauling of unit 4 of 210MW BTPS Parichha Similar Category Operation and Maintenance Power House/Power Plant
Laying of Dedicated pipe line for improvement of functionality and Design, Supplying. Fabrication, Erection Commissioning including 3 (three) months Trial Run of 135m3 hr. capacity Pressure type IRON ELIMINATION Plant with backwash water disp
Supplying, Fabrication, Erection on suitable RCC foundation and Commissioning with 3 (three) months Trial Run (including cost of routine testing of water sample for performance evaluation) of pressure type Iron removal plant as per design norms of the P.H.E. Dte. with necessary accessories viz. MS fabricated shell with minimum 10 mm thick MS plate with 2 (two) coats of anticorrosive paint & minimum 12 mm thick MS media supporting plate fitted with required no. of pot strainer, MS fabricated oxidation chamber with minimum 10 mm thick plate with necessary pipe connection, valves, Gauges & other instruments as required as per departmental approved design & drawing including cost of filter media, Air Compressor & Air blower with motor, starter, main switch etc. of required capacity & approved specification including power connection from main line etc. all complete. (Rate excludes the cost of Concrete Platform & drain, and the cost of Blower Room). 135m3/hr. capacity