Design, Engineering, Supply, Fabrication, Erection, Installation, Trial run, Testing, and commissioning with conversion of the existing Steam operated winder to Electrical winder along-with CAMC for 05 year at Ballarpur 3 and 4 UG, Ballarpur Area
Design, Engineering, Supply, Fabrication, Erection, Installation, Trial run, Testing and commissioning of Electric drive Unit along-with CAMC for 05 years by converting the existing Steam operated winders to Electrical winder at Ballarpur 3&4 UG Mine of Ballarpur Area
Design, Supplying, Fabrication, Erection Commissioning including 3 (three) months Trial Run of 25 m3hr. capacity Pressure type Iron Elimination Plant with Construction of Blower room backwash water disposal at Tube Well No. 4 of Gun Sankrul Wate
Supplying, Fabrication, Erection on suitable RCC foundation and Commissioning with 3 (three) months Trial Run (including cost of routine testing of water sample for performance evaluation) of pressure type Iron removal plant as per design norms of the P.H.E. Dte. with necessary accessories viz. MS fabricated shell with minimum 10 mm thick MS plate with 2 (two) coats of anticorrosive paint & minimum 12 mm thick MS media supporting plate fitted with required no. of pot strainer, MS fabricated oxidation chamber with minimum 10 mm thick plate with necessary pipe connection, valves, Gauges & other instruments as required as per departmental approved design & drawing including cost of filter media, Air Compressor & Air blower with motor, starter, main switch etc. of required capacity & approved specification including power connection from main line etc. all complete. (Rate excludes the cost of Concrete Platform & drain, and the cost of Blower Room): 25 m³/hr. capacity
Design, Supplying, Fabrication, Erection Commissioning including 3 (three) months Trial Run of 2 (Two) nos 25 m3 hr. capacity Pressure type Iron Elimination Plant with Construction of Blower room backwash water disposal at KADIRPUR Water Supply Schem
Supplying, Fabrication, Erection on suitable RCC foundation and Commissioning with 3 (three) months Trial Run (including cost of routine testing of water sample for performance evaluation) of pressure type Iron removal plant as per design norms of the P.H.E. Dte. with necessary accessories viz. MS fabricated shell with minimum 10 mm thick MS plate with 2 (two) coats of anticorrosive paint & minimum 12 mm thick MS media supporting plate fitted with required no. of pot strainer, MS fabricated oxidation chamber with minimum 10 mm thick plate with necessary pipe connection, valves, Gauges & other instruments as required as per departmental approved design & drawing including cost of filter media, Air Compressor & Air blower with motor, starter, main switch etc. of required capacity & approved specification including power connection from main line etc. all complete. (Rate excludes the cost of Concrete Platform & drain, and the cost of Blower Room): 25 m³/hr. capacity
SURVEY, DESIGN, FABRICATION, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF 170 KW GRID CONNECTED SOLAR PV PLANT WITH NET METERING AT GOVERNMENT COLLEGE OF ENGINEERING CHANDRAPUR OF DISTRICT CHANDRAPUR IN THE STATE OF MAHARASHTRA WITH 5 YEARS CMC
SURVEY, DESIGN, FABRICATION, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF TOTAL 170 KW GRID CONNECTED SOLAR PV POWER PLANT WITH ROOF-TOP NET METERING AT GOVERNMENT COLLEGE OF ENGINEERING CHANDRAPUR OF DISTRICT CHANDRAPUR IN THE STATE OF MAHARASHTRA WITH COMPREHENSIVE MAINTENANCE CONTRACT FOR 5 YEARS.
Work of Reparing of Valve Chamber, MS fabrication, Tube well Deepning and Carriage of Material, Earth Filling etc works at Various JJY and Regular Schemes under Jen Section Jhirana Sub Division Pepplu under Jurisdiction of Division Malpura.