Loading…
Loading…
6,404 results • Best match
Erection & labour work of supply, laying, testing & commissioning of 11/22 kv underground XLPE cable (XLPE cable will be supplied by DGVCL) with cable end termination & straight through jointing kit (to be supplied by contractor) on ARC basis under all scheme under PIPLOD sub division under Piplod Division as well as all Sub-division in jurisdiction under Piplod Division or within the jurisdiction of Surat City Circle.
fitting of necessary fabrication for 11KV cable including
Construction of New Anganwadi Building at Rajaji Road Community Hall ward no 12 in Palani Municipality
Supplying fabrication and placing in position of mild steel or ribbed tar steel for reinforced cement works including cost of steel binding wire all labour charges for cutting fabrication and placing of rods and other incidental charges etc., complete as per standard specification.
Provision of FOB 03 m wide with ramps for recoupment of shortfall in Minimum Essential Amenities at Karonda(KOA) under VGLJ-BINA Section.
31000.00 Fe-500D or more of approved brands/makes. BRIDGELINE-JHS-ENGINEERING/NORTH CENTRAL RLY Supplying, fabrication, assembling of all types of steel girders of specified spans with structural steel conforming to Quality "B0" Grade Designation E250 conforming to IS:2062, erection / slewing / end launching of steel girders with cranes or any other approved launching methods as per site conditions (not requiring traffic block) on sub- structure including provision of trolley refuges etc., complete as per approved QAP and drawings conforming to IRS-B1-2001 and other relevant codes and specifications. Note: 1. Detailed fabrication and erection drawings & launching methodology will be prepared by the contractor and got approved from Railway. 2. The rate is all inclusive including launching in position, complete in all respect except cost of (i) Painting / Metalising; (ii) Bearings & (iii) HSFG bolts which shall be paid extra under relevant item. 3. The payment shall be made on the theoretical weight of main components and gusset plates only. 4. Payment Schedule: (i) Receipt of material at site: 40% (ii) Fabrication of girders: 20% (iii) Erection/Launching: 20% (iv) Completion in all respects: 20%
Buds school electrification
90.3.18.2:Supply, fabrication, conveyance and fixing the following sizes of B class GI pipe bent to shape / cut and welded to shape and fixing the same to wall / parapet using clamps as noted along with each size, painting with 2 coats of synthetic enamel paint over a coat of zinc chromate primer, making good the damages, colour washing etc as required.32 mm dia with HG company fabricated clamps
REPAIR/MAINT OF HT 33/11 KV OH LINE/ UG CABLE, HT VCBS, RMUS AND TRANSFORMERS INSTALLED AT DOMESTIC AREA, 3LU AND SITE 1A AND 1B AT AFS JODHPUR
M & L for cross arms, bracing supports, clamps back plates angles fabricated from the structural steel section including bolts, nuts, washers, welding, bending, drilling holes for bolts, bent to any required shape of size as indicated or directed, inclusive of one rimer coat and two coats of aluminium paint after preparation of surfaces.
Comprehensive development work of Ramdev Park and Adjacent building in ward no.51(57) Rajmahal Nagar
Steel Fabrication: Supplying, fitting and placing TMT FE 550 / 550D Steel Reinforcement including cost of all materials, machinery, labour, cleaning, straightening, cutting, bending, hooking, laping/w...