Loading…
Loading…
6,137 results • Best match
Dismantling, Fabrication, Supply and Erection work of Well Step Ladder and Its platform for B.P.O gate (02 Nos) and L.B.H.R Gate (01 nos) and R.B.H.R Gate (01 Nos) including cost of labours, materials, tools, tackles, scaffolding, transportations, Painting etc as per specification and Actual site situation and Instruction of Engineer In charge at Damanganga Reservoir Project, Madhuban Colony. District: - Valsad. Dismantling Scrap Given to the Contractor.
Providing Extra steel as per IS 2062, Fabrication and erection work for structure of gate and its parts considering actual
Facility Management Services - LumpSum Based - Industrial; Assistance for providing insulation in Sodium systems at PFBR Site 1) Highly Skilled Sheet Metal Fabricator-Quantity - 275 Operations, 2) Highly Skilled Insulation Lagger -Quantity - 550 Oper..
Facility Management Services - LumpSum Based - Industrial; Assistance for providing insulation in Sodium systems at PFBR Site 1) Highly Skilled Sheet Metal Fabricator-Quantity - 275 Operations
Iron work for Cable Tray at SMS Hospital , Jaipur
Supply & fabrication steel structure with MS channel / angle / joist / ISMB / sheet etc. including welding, rivetting, cutting, nut & bolt , one coat of primer & two coat of enamel paint etc. as required complete in all respect. .
Revamping works of port owned 02 nos 20Ton ELL Grab cranes and 01 no 10Ton Ell wharf crane
Supply of various type steel,Fabrication, Erection, Installation & Commissioning of all the deteriorated primary structures in all the 02 Nos 20T and 01 No 10T ELL cranes as per the scope and technical specification.
Construction of CC Drain with cover slabs from Chillari Baby (H) to Undavalli Ramachandra Rao (H) in Velivennu (V) of Undrajavaram (M). Est. Cost: Rs. 14.00 Lakhs
Vibrated Cement Concrete Nominal Mix(1:3:6) using 40mm downgraded HBG metal including cost of all materials and labour charges etc,,complete -1 cum with Machine mixing for CC Bed including conveyance, seigonarage of materials of sand &metal and excluding cost of steel and its fabrication charges etc .
Construction of RWS&S Sub Division Office Building at Parchur Village in Parchur Mandal of Bapatla District.Est.Cost.30.00 Lakhs
VRCC M- 30 grade design mix 20mm size HBG (SS-5) metal from approved quarry using minium 350 kg of cemnet of concrete including cost and conveyance of all materials like cement, fine aggregate (sand) coarse aggregate, water etc., to site including all operational, incidental and labour charges such as machine mixing, laying concrete, curing etc., complete but excluding cost of steel and its fabrication & seigniorage charges for 60cm wide sun-shades of 75mm thick at fixed end and 50mm thick at free end with an average thickness of 62.5mm, and Lofts. (As per BLD-CSTN) Sunshades of 0.60 mt wide Windows W1For Doors D1