Loading…
Loading…
29,902 results • Best match
Fabrication of 2nd motion shaft with mounted pinion (including drive pinion) of gear box assembly of Winding Engine on turnkey basis at Chora 10 Pit Colliery under Kenda Area
Material Cost: Cast Steel 18-2707 GR-11
MTPS-II-M-II-CHP-I Division - Providing the stay support for the existing dust screen provided near JT-7 to PCH area including supply, fabrication and erection etc
Charges for Supply, fabrication and placing in position of vertical column posts and inclined struts using I BEAM 200x100x5.7 mm, welded with base plate , ISA 60x60x8 mm to strengthen of stay , the rate includes cost for supply of MS beams, angles, MS base plate and charges for fabrication, aligning, placing in position, erecting the posts, all labour charges, scaffolding charges, welding, bolts and nuts if required, all lead, lift, etc., complete
Custom Bid for Services - Miscellaneous Repair, Fabrication, FTP Filter bag Replacement & Unloading of Alumina from BTAP Wagons in Potline Similar Category Operation And Maintenance Of Other Machines And Plants
Supply and fixing heat shrinkable cable termination and straight jointing kits and fabrication of fan covers and terminal box of motors at JRD rly siding of AKKOCP, BnK Area.
Fabrication / making of S.S.316 spindles and Brass Nuts including Cap set with pin and other items as per sample for North and South filter house HP-I WW.
Repairing of old panel, support of vibrating screen 111A1A2 and B1B2 and Traverse pipe dismantling and new fabrication and erection and A1, B1 different Grizzly repair of Pre-Washery.
Repairing of old panel, support of vibrating screen 111A1A2 & B1B2 and Traverse pipe dismantling and new fabrication and erection. (a) Material shifting cost.