Loading…
Loading…
30,601 results • Best match
Design,Fabrication, Supply, Installation,Testing, Liassoning and Commissioning of 25 KWp Grid Connected Solar PV Power Plant under RoofTop Net Metering System with Remote Monitoring system along with Five Years Comprehensive Maintenance Contract (CM
eProcurement System Government of Maharashtra Created By: Yatiraj Jadhav Created Date/Time: 15-Apr-2026 11:09 AM Tender Title: Design,Fabrication, Supply, Installation,Testing, Liassoning and Commissioning of 25 KWp Grid Connected Solar PV Power Plant under RoofTop Net Metering System with Remote Monitoring system along with Five Years Comprehensive Maintenance Contract (CM Tender ID: 2026_DMA_1290893_1
GENERAL- Pothundy project- Replacement of Thalippadam cross regulator shutter- Fabrication painting and erection of cross regulator shutter with worm and pinion mechanism at - Ch 04-500km of Pothundy LB canal under LBC section Nemmara
OD40412/2025-2026:Fabrication and supply of Structural steel Canal shutters ( Up to 2 tonne weight ) /Hoisting bridge/ Platform and accessories etc. as per approved specifications, drawings and directions of deptl. officer at site including cost of labour, machinery, all leads and lifts, incidental and handling charges etc. complete but excluding cost of material already supplied
DESIGN, FABRICATION, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF TOTAL 45 KW GRID CONNECTED SOLAR PV POWER PLANT WITH ROOF-TOP NET METERING AT VARIOUS GRAMPANCHAYAT OFFICES IN WARDHA DISTRICT IN THE STATE OF MAHARASHTRA
SURVEY, DESIGN, FABRICATION, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF TOTAL 45 KW GRID CONNECTED SOLAR PV POWER PLANT WITH ROOF-TOP NET METERING AT VARIOUS GRAMPANCHAYAT OFFICES IN WARDHA DISTRICT IN THE STATE OF MAHARASHTRA WITH COMPREHENSIVE MAINTENANCE CONTRACT FOR 5 YEARS.
FABRICATION WELDING INSTALLATION TESTING and COMMISSIONING OF 04 X 500 KL HORIZONTAL SEMI-BURRIED TANKS FOR ATF PRODUCT PIPELINE WORKS AND ASSOCIATED WORKS FOR BPIs AT LEH AFS LADAKH UNDER IOCL PUNJAB STATE OFFICE
WC for Overhauling of Ring Granulator including repairing fabrication of cage frame/breaker plate/ top n bottom screen plate/ kick off plate/ RPG gates/ hood Hydraulic cylinders n shifting and installation of rotor assembly
Fabrication of Breaker plate for Ring Granulator. (CHP-I :08 Nos.+ CHP-II :08 Nos.)
Design, Fabrication, Transport, Supply Erection, Testing and Commissioning of radial gate shutters 4 Nos. including hoisting arrangements for controlled Spillway and Embedded parts for River Sluice shutter 1No. along with emergency gate grooves in
Conducting the following minimum quality tests as per approved QAP at various stages of work to ensure raw materials and its fabrication are free from defects as per industry standards and maintenance of records at all stages for assurance of quality. Raw materials such as hot rolled plates and sectional structures are tested for physical & chemical properties - one random sample for minimum of 40 tonnes of plate/structural weight. Stainless steel seal seat, wheel track plate shall be tested for physical & chemical properties – one sample (Random) for entire lot of any size. Steel casting materials shall be checked with ultrasonic testing and magnetic particle inspection on finished surfaces in outer diameter and inner diameter, wherever applicable on wheels, gears, pinion, drum. Rubber seals are tested in house for physical properties such as Hardness, Elongation, Tensile strength, Tensile test after ageing, water absorption test as per IS 11885 : 2004. All raw materials are 20% dimensional checked and verified in accordance with manufacturer test certificate. In shop welding process, quality of fillet welds are checked visually and using 100% DPI/magnetic particle inspection. In site welding, quality of fillet weld is inspected either by 100% dye penetrant or magnetic particle inspection. For butt welds, 100% ultrasonic inspection is done for skin plate joints. Root weld is inspected by 100% dye penetrant test in butt welds. In site welding, internal inspection report shall be furnished at all stages of fabrication. Surface protective treatment such as blast cleaning, zinc primer and coal tar epoxy coating shall be done as per standard norms. Quality of blast cleaning is ensured by cleanliness to SA 2 ½ finish and profile measured using calibrated surface profile gauge. Thickness of primer and coal tar epoxy coatings are ensured by coating thickness gauge at random points. Finally to ensure the quality of coating system to be free from pinholes and cracks through holiday detector at random points. All reports and tests shall be furnished to the appropriate authority as directed by the departmental officers.