Loading…
Loading…
30,536 results • Best match
Design, Fabrication, Supply, Installation, Testing, Commissioning with Remote Monitoring System 20 kWp Capacity ON-GRID Solar PV Power Plant Under Roof-Top Net Metering System for State Water Informatics Center (SWIC) at Jalvidnyan Bhavan Nashik, Dis
Design, Fabrication, Supply, Installation, Testing, Commissioning with Remote Monitoring System 20 kWp Capacity ON-GRID Solar PV Power Plant Under Roof-Top Net Metering System for State Water Informatics Center (SWIC) at Jalvidnyan Bhavan Nashik, Dist. Nashik.
Supply,Fabrication,Installation,Testing and commissioning of main gate of Power House,cut out cover railing and staircase railing on different floor of Power House of Parbati-H.E. Project (Stage-II) (Package No-C-803-B)
Supply, Fabrication Transportation and Erection of Gates and Hoists for Lohapur to Tarakaj (DC No-2) under Doab-VII at Deuli at RD 1800m under Drainage Division, Shree Vihar, Puri for the year of 2025-26.
Survey, Design, Fabrication, Supply, Installation, Testing, Commissioning of On-Grid Solar Rooftop Project with Net Meter and Remote Monitoring System, capacity of 35kW at various 7 z.p. schools in Beed District of Maharashtra with CMC 5years
Survey, Design, Fabrication, Supply, Installation, Testing, Commissioning of On-Grid Solar Rooftop Project with Net Meter and Remote Monitoring System, capacity of 35kW at various 7 z.p. schools in Beed District of Maharashtra with Comprehensive Maintenance Contract (CMC) for 5 years.
ERECTION INSTALLATION AND COMMISSIONING OF 1 TPH SOLID FUEL WOOD OR BIOMASS BRIQUETTES FIRED HORIZONTAL MULTI TUBULAR MULTI PASS 3 PASS WET BACK IBR BOILER ALONG WITH SUPPLY AND FABRICATION OF STEAM LINE AND CONDENSATE LINE
Execution of Miscellaneous Electrical and Safety Works near Kargali Siding like Fabrication and erection of lighting tower for improved illumination in the loading area, Installation of ESE-type lightning arrestor, Stringing of sagging spans of HT