Loading…
Loading…
31,800 results • Best match
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Manufacturing Unit; CC/O/AMM-I/M/2526/405 Installation of Natural Gas (NG) pre- heater along with fabrication and erection of connected pipings in Ammonia -1 Plant at RCF..
and Installation of Plant Systems/Equipments (Version 2) - Manufacturing Unit; CC/O/AMM-I/M/2526/405 Installation of Natural Gas (NG) pre- heater along with fabrication and erection of connected pipings in Ammonia -1 Plant at RCF..
Replacement of worn out intermediate frame and deck plates, installation and erection of idler frame with rollers, return rollers, fabrication and erection of counter weights plate from and same of unit no. 201 drive side to both side counter weig
Fabrication and erection of materials
Replacement and repairing of damaged intermediate frame and deck plates, installation of idler frame with rollers, fabrication and erection of same at unit no. 301 drive side belt conveyor of ROM section at Madhuban Coal Washery under Block-II Area,
Fabrication and erection of materials
MTPS I Mill Plant Unit I Dismantling patch welding and assembling of Mill outlet elbows orifices Transition pieces fabrication of spool piece Multiple port outlets etc and Hard facing of vertical coal pipe 1mtr length after Transition piece in Mill
Charges for dismantling the Spool pieces, multiple port outlet bodies and transition pipes 4 Nos. each after assembling the coal pipe inspection with center feed pipe structures including transportation of supporting material from stores to site and re-fixing the Spool piece, MPO bodies and transition pieces and assembling to its original position and carrying out necessary related works. and devolution of scraps to stores.
Fabrication and commissioning of 0ne No. PVC drum pontoon for One No of pump capacity 1000 GPM/2000 GPM to run in the quarry sump for quick dewatering in the upcoming monsoon 2026 at Parej East OCP under Hazaribagh Area.
Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
Providing of Gate and Top and Side Covering for Safe operation of 2.5MVA, 11KV/3.3 KV Transformer of NC Patch III Sub Station and Fabrication of Gate and Window for Rest Shelter of 14 No Parking of KOCP under ABDKC
Providing of Gate & Top & Side Covering for Safe operation of 2.5MVA, 11KV/3.3 KV Transformer of NC Patch –III Sub Station & Fabrication of Gate & Window for Rest Shelter of 14 No Parking of KOCP under ABDKC.