Loading…
Loading…
31,799 results • Best match
SURVEY, DESIGN, FABRICATION, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF TOTAL 127 NOS. OF 18-WATT AND 27 NOS. OF 24-WATT SOLAR LED STREET LIGHTING SYSTEM AT NAGAR PANCHAYAT BIDGAON, TA. KAMPTEE UNDER DISTRICT NAGPUR IN THE STATE OF MAHARASHTR
eProcurement System Government of Maharashtra Created By: Sarang Mahajan Created Date/Time: 24-Feb-2026 11:00 AM Tender Title: SURVEY, DESIGN, FABRICATION, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF TOTAL 127 NOS. OF 18-WATT AND 27 NOS. OF 24-WATT SOLAR LED STREET LIGHTING SYSTEM AT NAGAR PANCHAYAT BIDGAON, TA. KAMPTEE UNDER DISTRICT NAGPUR IN THE STATE OF MAHARASHTR Tender ID: 2025_MEDA_1229067_1
SURVEY, DESIGN, FABRICATION, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF TOTAL 228 NOS. OF 18-WATT AND 163 NOS. OF 24-WATT SOLAR LED STREET LIGHTING SYSTEM AT NAGAR PANCHAYAT MAHADULA, TA. KAMPTEE UNDER DISTRICT NAGPUR IN THE STATE OF MAH
eProcurement System Government of Maharashtra Created By: Sarang Mahajan Created Date/Time: 24-Feb-2026 11:10 AM Tender Title: SURVEY, DESIGN, FABRICATION, SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF TOTAL 228 NOS. OF 18-WATT AND 163 NOS. OF 24-WATT SOLAR LED STREET LIGHTING SYSTEM AT NAGAR PANCHAYAT MAHADULA, TA. KAMPTEE UNDER DISTRICT NAGPUR IN THE STATE OF MAH Tender ID: 2025_MEDA_1229015_1
Supply and fixing of change over switch 100Amp/415V/ 50Hz (four pole) (02Nos), 200Amp/415V/50Hz, (four pole) (02 Nos) for different location and fabrication of 01 No Shade with chemical earth pit for DG Set at Rest house Bhurkunda Proj
Replacement of worn out intermediate frame and deck plates, installation and erection of idler frame with roller, return rollers, fabrication and erection of same at 902-2 drive side belt conveyor of PS-9 section at Madhuban Coal Washery und
Demolishing of damaged concrete RCC Base, dismantling of M.S Foundation frame and Casting of new concrete RCC Base with fabrication of new M.S Foundation frame for Pump-Motor No-3 of Phase-II along with anticorrosive painting of all foundation frame
W/c for transportation of HDPEpipes,its accessories to ash dyke and fabrication of branchpipes for water distribution from 300NBwater supply line and installation,along with round the clock operation and care,system at ash dyke lagoon no.2 of 2x660MW
Transportation of 3300mtr HDPE pipes, its accessories from BMD OS-II store to ash dyke & fabrication of branch pipes for water distribution from 300 NB water supply lines and installation of 67 nos. sprinkler/Mist Nozzles on branches stretched in ash dyke lagoon along with complete dismantling of sprinkler system & return transportation to BMD OS-II store.