Loading…
Loading…
32,322 results • Best match
FOR THE WORK FABRICATION, PROVIDING, ERECTION, REPAIR AND MAINTENANCE OF C.R. AND H.R. GATE OF MAJHOLI DISTRIBUTORY CANAL AND DIRECT OUTLET AT R.D. 20.67 KM. TO R.D. 26.30 KM., R.D. 0.750 KM. TO 0.90 KM. AND R.D. 1.00 KM. TO R.D. 2.31 KM. OF R.B.C. O
Supply Fabrication and Erection of Structures for Enhancement of 2 X 16 MVA 110/11KV into 3 X 16 110/11 KV MVA Power Transformer capacity and Additional GC Arrangement in 110 kV Side at Existing Sipcot II 110 11 KV SS in Salem Operation Circle
DELIVERY SHORTING AND FABRICATION OF REQUIRED MATCHING PIECES FOR HAULING OF 2000 GPM KBL PUMP-02 NOS.AND 3000 GPM FLOW MORE PUMP AT WEST CORNER 5 TIMES DUE TO INCREASING WATER LAVEL AT AKWMC,OCP UNDER KATRAS AREA.(2) HAULING OF 150 HP PUMP FROM 27 P
(4) FABRICATION OF BENDS,U&JOINTING/WELDING OF 10" & 8" FOR DEWATERING OF OCP,AKWMC.:- FABRICATION OF 10"&08" BENDS 6 NOS.FOR REPLACEMENT IN VERTICAL RANGE. (03 H/SK + 03 SK) 3X502.44+3X434.96 = 2812.20
As mentioned in Reg. 188 of CMR 2026 proposal for fabrication and installation of 8 nos (04 Amgaon and 04 Amera) skid Mounted Portable Blasting Shelter of size 6 feet x 6 feet related to Mines workers safety for Amgaon and Amera OCP of Bishrampur Are
Fabrication of 08 nos blasting shelters of design as per the drawing enclosed with this NIT (as annexure XIV) by providing all the requisite materials and workmanship. Each blasting shelter shall be of size 6 feet length x 6 feet width x 8 feet height. Weight of each shelter shall be around 4330 Kg considering of following materials of rough weight MS Sheet 3.15 mm: 1800 Kg approx MS Channel : 1300 Kg approx MS Angle: 1200 Kg J hook, nut bolts, washers: 30Kg approx with Paints, fale ceiling, cushion seats, bulb, fans, insulation interior interior with wooden finishing etc. Channels shall be provided at the base of the shelters for structureal rigidity and pulling/drawing hooks shall be provided to enable easy shifting of the shelter by pulling. At-least 2 hooks shall be provided on the top of the shelter, so that the shelter can be lifted for transportation. The lifting hooks shall be connected to the base with structural membrances of suitable strength. Transportation of the blasting shelter to mine permises as per instruction of engineer in-charge. Supply of all the materials required for fabrication of the shelters like MS sheets, angles, square pipes, channels, plates, hooks, nut bolts, paints, welding electrodes, industrial gas etc. is in the scope of work and shall be provided by the contractor .
Target 2025-26- Fabrication of 3m Channel Cross Arms 6640 Nos, 4 Line Channel Cross Arms 43042 Nos, 2 Line Channel Cross Arms 66628 Nos, 1.8m Channel Cross Arms 3400 Nos, 2.4m Channel Cross Arms 1700 Nos, Back Clamps for LT (2/4 Line) Cross Arms 6000
Fabrication of tension plate 04 nos. along with tension bolt to top tumbler of 208 unit no. middling BE and replacement of damaged/worn-out discharge chute liner plate along with mother base plate and base angle of 222,223,207 and 208 B/E of K/W
Fabrication/erection of new tension plate.