| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹8.3 LAccepted-AOC 0 2 12 SIJUA TETULMURI DHANBAD DHANBAD JHARKHAND 828121 INDIA | DHANBAD | DHANBAD | JHARKHAND | 828121 | ₹8.3 L | L-1 | Accepted-AOC L-1 |
| 2 | L-2₹8.5 LRejected-Finance ESTIMURI 22 12 SIJUA DHANBAD | DHANBAD | DHANBAD | JHARKHAND | 828121 | ₹8.5 L | L-2 | Rejected-Finance L-2 |
| 3 | L-3₹8.7 LRejected-Finance AT LOYABAD PO BANSJORA DIST DHANBAD | DHANBAD | JHARKHAND | 818142 | ₹8.7 L | L-3 | Rejected-Finance L-3 |
Tender Value
₹9.8 L
EMD Value
₹12,200
Closing Date
9 Mar 2026, 6:00 pmClosed
AREA MANAGER (ENM) KATRAS AREA
OFFICE OF THE GENERAL MANAGER BCCL KATRAS AREA IV ENM DEPT. Post-SIJUA PIN-828121 JHARKHAND
DELIVERY SHORTING AND FABRICATION OF REQUIRED MATCHING PIECES FOR HAULING OF 2000 GPM KBL PUMP-02 NOS.AND 3000 GPM FLOW MORE PUMP AT WEST CORNER 5 TIMES DUE TO INCREASING WATER LAVEL AT AKWMC,OCP UNDER KATRAS AREA.(2) HAULING OF 150 HP PUMP FROM 27 P
2026_BCCL_354799_1
BCCL/KA/IV/ENM/E-TEN/25-26/162 DT.27.2.2026
Open Tender
Electrical and Maintenance Works
10 days
AKWMC KATRAS AREA IV
Please refer Tender documents.
4 documents required · 4 mandatory
₹12,200
21 Mar 2026
27 Feb 2026
10 Mar 2026
27 Feb 2026
9 Mar 2026
27 Feb 2026
27 Feb 2026 - 2 Mar 2026
ITEM DESCRIPTION / HEADLING
(1) DELIVERY SHORTING AND FABRICATION OF REQUIRED MATCHING PIECES FOR HAULING OF 2000 GPM KBL PUMP-02 NOS.AND 3000 GPM FLOW MORE PUMP AT WEST CORNER 5 TIMES DUE TO INCREASING WATER LAVEL AT AKWMC,OCP UNDER KATRAS AREA.:- CUTTING WELDING,PATCH CUTTING FLANGE WELDING & HOLLERING WELDING 'L' BEND OF 10" PIPE - 03 NOS. SK-2X434.96 = 869.92 + S/SK- 6X329.96 = 1979.76 + OXYGEN 04 CYL. 4X143= 572.0 + D.A CYL 1 CYL = 1037.0 = 4458.68
CUTTING OF 10" PIPE BENDING PATCH CUTTING FLANGE WELDING HOLLERING & WELDING-FOR MAKING U BEND OF 10" PIPE. SK-2X434.96 = 869.92 + S/SK- 6X329.96 = 1979.76 + OXYGEN 04 CYL. 4X143= 572.0 + D.A CYL 1 CYL = 1037.0 = 4458.68
FAFRICATION OF 10" M.S PIPE ROAD CROSSING MATCHING IN THREE SIDE IN BOTH SIDE OCP HAUL ROAD. SK-2X434.96 = 869.92 + S/SK- 6X329.96 = 1979.76 + OXYGEN 04 CYL. 4X143= 572.0 + D.A CYL 1 CYL = 1037.0 = 4458.68
FABRICATION OF 10" FOOT VALVE FOR 2000 GPM PUMP- 02 NOS. & 3000 GPM PUMP 01 NO.CUTTING OF 10" PIPE REDUCING 10"X10" PLATE & FLAP CUTTING BOTTOM MAST DRILLING FLANGE WELDING. SK-2X434.96 = 869.92 + S/SK- 6X329.96 = 1979.76 + OXYGEN 04 CYL. 4X143= 572.0 + D.A CYL 1 CYL = 1037.0 = 4458.68
FABRICATION OF 10" MATCHING WITH SITE TO SITE . SK-2X434.96 = 869.92 + S/SK- 6X329.96 = 1979.76 + OXYGEN 04 CYL. 4X143= 572.0 + D.A CYL 1 CYL = 1037.0 = 4458.68
(2) HAULING OF 150 HP PUMP FROM 27 PILLER TO 23 PILLER INCLUDING ALL ALLIED ACCESSORIES(SUCTION,SLUICE VALVE,NON RETURN VALVE STARTER)AND REINSTALLATION AT 23 PILLER AT 2 SEAM AKWMC,:- DISMANTLING/HAULING OF DOMESTIC PUMP 600 GPM FROM 27 PILLER TO 23 PILLER OF MAN DIP ALL ACCESSORIES AT U/G 2 SEAM WMC. ( H/SK-2X502.44+SK-10X434.96) = 5354.48
HAULING & INSTALLATION OF 600 GPM 23 PILLER AT 2 SEAM WMC.( H/SK-2X502.44+SK-10X434.96) = 5354.48
DISMANTLING OF HAULING SUCTION,FOOT VALVE,NRV,SLUICE VALVE 27 LEVEL TO 23 LEVEL & ETC.U/G 2 SEAM. ( H/SK-2X502.44+SK-10X434.96) = 5354.48
INSTALLATION OF HAULING OF FITTING AND SUCTION FOOT VALVE,NRV SLUICE VALVE ETC.27 LEVEL U/G 2 SEAM WMC. ( H/SK-2X502.44+SK-10X434.96) = 5354.48
FABRICATION OF WITH NRV NON RETURN VALVE SHORT PIECES 23 LEVEL 2 SEAM ETC. ( H/SK-2X502.44+SK-10X434.96) = 5354.48
COST OF D.A
COST OF OXYGEN
(3) SHIFTING OF 800 GPM PUMP MOTOR SET COMPLETE WITH ELECTRICAL AND MECHANICAL FROM DEPARTMENTAL SUMP IN OCP,WMC,AND RE-INSTALLATION ALSO 8" PIPE DELIVERY RANGE SHIFTING APPROX 100 MTR AT AKWMC.:- DISMANTLING OF PUMP MOTOR SET,SUCTION,8" SLUCE VALVE,8" NON RETURN VALVE AND DELIVERY. 07 HEAD X 01 SHIFT)(H/SK-02X502.44+SK- 5X434.96)= 3179.68
MANUAL SHIFTING OF PUMP,MOTOR,SLUICE VALVE,NON RETURN VALVE,SUCTION PIPE,FOOT VALVE,BASE PLATE.14 HEAD X 01 SHIFT, H/SK-02X502.44+SK-12X434.96 = 6224.40
MANUAL SHIFTING OF STARTER,CABLE AND LAYING AT NEW LOCATION..12 HEAD X 01 SHIFT, H/SK-02X502.44+S/SK-12X329.96 = 4304.48
INSTALLATION OF BASE-PLATE,PUMP MOTOR,SLUICE VALVE AND NON RETURN VALVE AND SUCTION. 10 HEAD X 01 SHIFT, H/SK-03X502.44+SK-07X434.96 = 4552.04
LAYING AND ERECTION OF PIPE 8" INCLUDING TRANSPORTATION IN PLAIN. H/SK-02X502.44+SK-04 X434.96 X S/SK-4X329.96 = 3194.64.
FABRICATION OF SHORT PIECES. (04 HEAD X 01 SHIFT) (H/SK-01X502.44+SK-3X434.96) = 1807.32
FABRICATION OF FREE FLANGE.(4 HEAD X 01 SHIFT)(H/SK-1X502.44+SK-3X434.96)= 1807.32
FABRICATION OF MS BEND(12 HEAD X 03 SHIFT) (H/SK-01X502.44+SK-3X434.96) = 1807.32
TRANSPORTATION AND INSTALLATION/ERECTION OF SHORT PIECES/FREE FLANGE/BEND.(05 HEAD X 01 SHIFT) (H/SK-01X502.44+SK-4X434.96 ) = 2242.28
(4) FABRICATION OF BENDS,U&JOINTING/WELDING OF 10" & 8" FOR DEWATERING OF OCP,AKWMC.:- FABRICATION OF 10"&08" BENDS 6 NOS.FOR REPLACEMENT IN VERTICAL RANGE. (03 H/SK + 03 SK) 3X502.44+3X434.96 = 2812.20
FABRICATION OF SUCTION BENDS 10"08" & REDUCER 10X12 FOR EAST SUMP. (03 H/SK + 03 SK) 3X502.44+3X434.96 = 2812.20
FABRICATION OF 12 NOS.SHORT PICES & OFF SETS FOR 10"8" DELIVERY EAST SUMP & ROAD CROSSING.(03 H/SK + 03 SK) 3X502.44+3X434.96 = 2812.20
REPAIRING OF 10" & 8" PIPES INCLUDING CUTTING OF FLANGES STRAIGHTENING OF FLANGE & REPLACEMENT WELDING OF 12 FLANGES.(03 H/SK + 8 SK) 03X502.44+8X434.96 = 4987
(5) LIFTING AND LOWERING OF 120 HP SUBMERSIBLE MOTOR PUMP SET FROM 14/16 INCH BORE HOLE OF 150 MTRS DEPTH AT HIRAK OF SALANPUR COLLIERY,KATRAS AREA.:- (PART - A) LIFTING OF 120 HP SUBMERSIBLE PUMP MOTOR SET WITH LIFTING AND DISMANTLING OF 22 NUMBERS OF 6 INCH DIA X 06 MTRS LENGTH X 22 NOS.MS PIPE WITH FLAT CABLE FROM BORE HOLE OF DEPTH 150 MTRS AND KEPT THE PIPE AT SAFE PLACE FROM BORE HOLE.03X03(SK) = 09
LOWERING OF 120 HP SUBMERSIBLE PUMP MOTOR SET WITH ASSEMBLING AND LOWERING OF 22 NO.OF 6 INCH DIA X 6 MTRS LENGTH X 22 NOS.OF MS PIPE WITH FLAT CABLE TO BORE HOLE OF DEPTH APPROX 150 MTRS. S/SK- 6X14 = 42 HEAD
UNSKILLED - 54 HAED X 272.00 = 14688.00
PART-(B) HT NUT BOLTS 5/8X2.5 INCH
EPOXY COMPOUND WITH HARDERNER
M SEAL AND REQUIRED TAPES
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.40 MB
BOQ_367629.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid