Loading…
Loading…
33,883 results • Best match
12/SE(T)/GNZ/2026-27
Fabrication, erection of wire mesh fencing 2.0 Mtr. Height, on cements boundry of height 1.0 fit. including grouting of fabrication MS Angle 50x50x6 mm. Painting of fencing and support with all material as per specification around 11/.4 KV Sub-Station. (All material shall be supplied by the contractor.) (List of Place of transformer will be provided by division at the time of execution).
Construction of Village Secretariat Building at Mugaiyur Village in Mugaiyur Panchayat at Lathur Panchayat Union. Scheme MINES/2025-26.Estimate.45.30 Lakhs
Supplying and fabrication of steel including cost and conveyance of steel to site and cost of binding wire including all labour charges for cutting,bending, tying and forming grills for all works
11/SE(T)/LCZ/2026-27
Isolator Structure-Fabrication of Isolator structure minimum 3.5 mtr overall height and 2.5 mtr above ground level as per RESSPO drawing, ...
PROVISION OF SOLID WASTE MANAGEMENT INFRASTRUCTURE AT BATHINDA MIL STN
... waste materials in case it is asked by the department. (d) Design, prepare architectural/ structural drawing, fabrication, supply, transportation, erection of pre-engineered shed. (e) Design, prepare architectural/ structural drawing, supply, transportation, construction, installation of Weigh Bridge. (f) Design, ...
Boiler IBR Jobs
Supply, dismantling, fabrication and erection of front header tube of boiler No. 1 & 2 with seam less stubs 4.5 mm thickness... Tube = 15 mtr. Tube Size: 63.5mm (OD), 3.66mm thickness. b. Material specification and fabrication: Tubes should be confirming to Bs 3059 Part 1 ER W 320 (1978), Min UTS 3262 kgf/cm2, fabricated as per drawing/sample and IBR norms. c. Dismantling & Erection of front header tubes ...
TURIF 2025-26 Perundurai Municipality Renewal of BT Road PAKAGE 2
Cement Concrete M7.5 1:4:8 (Design mix) using 40 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but soft water labour charges for mixing, transporting, placing in position, vibrating ...