Loading…
Loading…
34,166 results • Best match
Rerouting/overhead erection of MS ERW pipelines with associated fittings of various sizes of fire fighting system of 2X300MW, DCRTPP, HPGCL, Yamuna Nagar
Fabrication and erection of structural supports from standard sections
AS PER BOQ
... pipes 3mtr length each of suitable dia. as per available discharge. Then providing and fabrication of M.S. Flanges and welding the same on both sides of G.I. Pipes in proper alignment.... such as nuts, bolts & washers and making of electrical connections with starter panel. Fabrication of well cap, tie rod along with G.I. bend, elbow for delivery of water. Providing, fitting ...
Construction of Compound wall at Ward No 7 Gassifier Crematorium in Thiruporur Townpanchayat Chengalpattu District
Supply and fabrication of steel and placing in position MS/Ribbed tor steel grills for RCC works as per design given including cost of steel and GI binding wire in all floors etc., complete complying with standard specificationsas directed by the departmentsl officers
Procuring MS Barrels, Rubber Rings and other necessary Specials
OD5/2026-2027:Supplying fabricated MS pipe of size 900mm ID using 8mm thick specially made MS plate for pipe fabrication including cost and conveyance charges of MS plate all fabrication charges , laoding unloading with crane hire charges of pipe bending machine painting with branded epoxy primer and paint two coat and supply to section store and placed at convenient place as commenced.
Widening from Intermediate Lane to Two lane and strengthening from Km 2/5-4/0 and 5/0 -12/0 of Kurinjipadi - Palur road SH-252 including Re-construction of culvert at km 5/8, km 8/10, km 9/8 and construction of Retaining wall at km 7/6
Supply and Fabrication of steel Grade Fe-500 at site required for all RCC items of works involved in the schedule including cost of steel at site, cost of fabrication, labour charges for cleaning the bars, straightening, cutting, bending, tying grills, ...
Repairing of swing gearbox assembly, drag gearbox assembly, cracks in A-Frame and boom lower chord and other repairing works in Agni Dragline (24/88R) of Amlohri Project.
Cleaning of working area, fabrication of working platform and dismantling of drag gearbox cover, pinion shaft, etc.