Loading…
Loading…
34,166 results • Best match
Increasing Capacity Works
L.A.s/P.I.s,/C.T.s/P.T.s/Fuse Set structure:– (0+16+3 = 19 Nos.) Fabrication & erection of Lightening Arrestors, Post Insulators/Fuse Set, C.T.'s structure and Plinth for the same as per drawing No. RES-39 details (Quantity for five structures):– a) Excavation of earth (0.30×0.30×1.0)m for 02 Nos. Pits of above structures.
Repairing and maintenance of OH Line from Chapui Khas Colliery substation to Oria Dhawra under Chapui Khas Colliery
supply and erection of nut bolts fabrication, hoisting and erection of clamps,etc
Repairing of Two Nos. of 48 barrel pontoon at Dalurband OCP under Pandaveswar Area.
New fabrication of 02 nos(Part) 24 barrel float
Design, supply, installation, testing, commissioning and integration of a 50 kWp grid-tied solar power plant at RRCAT, Indore.
MS Support and angle fabrication: Fabrication, Supply and Installation of MS support, MS angle, channel etc. of various size with two coats of primer and two coats of synthetic enamal painting. The fabrication includes fabrication of MS supports as per the site requirement and instruction of the department. Grouting and fixing over EP/minor civil work are included in the item.
Strengthening the Road from NH 45 B Road to Poolampatti Karnipatti in Marungapuri block, Tiruchirappalli Dt.Pkg19
CC 1:2:4 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site excluding cost and fabrication of steel with all labour charges for laying mixing concrete curing compacting for labour with centering arrangement all includingcharges etc., completefor Bed Block CH 1730
Construction of Bridge at ward no 3 Mettumarudur, Marudur Town Panchayat Karur District
Supply and fabrication of Fe-500 steel required for all RCC items of works involved in the schedule cost of steel at site fabrication,labour charges for cleaning the rods straightening, cutting, bending, tying grills, including ...