Loading…
Loading…
10,261 results • Best match
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Thermal power plant; Work of repairing and rewinding of BHEL make ESP Rectifier Transformers Unit No 3 4 5 up to 90 KVA 53 point 57KV 373 point 5 V AC DC Output 7..
and Installation of Plant Systems/Equipments (Version 2) - Thermal power plant; Work of repairing and rewinding of BHEL make ESP Rectifier Transformers Unit No 3 4 5 up to 90 KVA 53 point 57KV 373 point 5 V AC DC Output 7..
Vadodara division-(Zone-2 BH 2026-27):- Zone work for day to day maintenance and repair of track bridges,road over bridges under the jurisdiction of Sr.Section Engineer( Bridge ) Bharuch of Vadodara division for the year 2026-27 (For 12 months)(Re-Invited-1).
A-New works and all ordinary repairs and maintenance work up to Above/
NRS MEDICAL COLLEGE AND HOSPITAL REGULAR MAINTENANCE AND REPAIR TO DIFFERENT BUILDINGS ie OPD BUILDING CHEST BUILDING ETC WITHIN THE COMPOUND UNDER JURISDICTION CONTROL OF NRSHSD P W Dte DURING THE FY YEAR 20262027 SECTION I R AND B WORKS
Labour for taking out rolling shutter (only shutter portion), dismantling by parts for repair (or replacement of damaged parts only),rehanging and re-fitting the same in position after necessary repairs (excluding the cost of supply of new parts).
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - THERMAL POWER PLANT; Work of Overhauling of Unit 3 4 Bottom Ash System Clinker Crusher Jet Pumps Feed Gates Valves etc during AOH COH Short shutdown FSD and As and ..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - WT-5183G Miscellaneous C&I related pneumatic cylinder works to be carried out as and when required for Unit #6, Ukai TPS; WT-5183G Miscellaneous C&I related pneumatic cyl..
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - THERMAL POWER PLANT; Work of shifting removing and laying the 33 kV power cable of 2 *100 MW Raghanesda Phase I and II GSECL Solar Plant from the existing power evacuat..