Loading…
Loading…
60,783 results • Best match
Annual Comprehensive Servicing Maintenance contract of Safe Ride Elevator Make 2 Nos. 08 Eight Passenger MRL Lift No. 1 and 2 for G3 Storied Prashasan Bhavan Building at Suri in the district of Birbhum.
Work for Repair and Preventive Maintenance of pipelines (leakages and pollution control) including Daily Operation of Valves of Water Supply Schemes at Gopalbari Chowki under the jurisdiction of City Sub Division-IV (South), Jyoti Nagar, Jaipur.
Maintenance of pipelines irrespective of size and material which includes repairing of bursts and leakages, pollution control, survey and removal of choking, disconnection... also include cutting of pipe ends, fixing of pipe piece with jjointing material to make repair leak proof and refilling of pit by excavated sand by ramming it at sides of pipes and ...
Custom Bid for Services - Total Cost of Manpower, Custom Bid for Services - Total Cost of Consumables Similar Category Facility Management Service- Manpower based (Version 2) Facility Management Service- Manpower based (Version 2)
Custom Bid for Services - Total Cost of Consumables Similar Category Facility Management Service- Manpower based (Version 2) Facility Management Service- Manpower based (Version 2)
Annual Comprehensive maintenance of ACs Units and Operation maintenance of 250 KVA D.G Set at NKN POP for NIC at 2nd Floor, CGO Bldg., CBD Belapur, Navi Mumbai for F.Y. 2025-26 (SH-Provisioning of 32 amp. Industrial Power socket, Distribution Board, Cable & miscellaneous work.)
Annual Repair & Maintenance of Residential and Non-Residential Buildings of S.J. Hospital and VMMC during 2025-26. SH: Maintenance of different E & M Services and Civil Works.
GENERAL-AMC-2025-2026- KUTTIPUZHA AREA-Fully Comprehensive Annual Maintenance of kuttippuzha no1, kuttippuzha no2, palooppuzha new amp palooppuzha old LI Schemes under Electrical LI section Aluva General Electrical Work
OD59088/2025-2026:Fully Comprehensive Annual Maintenance of up to 5 HP Vacuum motor pump set , D.O.L starter ,controlling electrical accessories , etc complete for a period of 12 months including attending all repairs , reconditioning the damaged parts, replacing spares with original make as per sample, ...