Loading…
Loading…
483 results • Best match
SET OF NON-METALLIC PIPE
Description :SET OF NON-METALLIC PIPE (SMOKE DETECTOR) TO SPEC. NO. CLW/ES/3/0254/E , DRAWING AS PER SET LIST EL29230020 REV.-2, AND STR NO. CLW/2021/ELDO/E/STR/116 REV.-0. [ Warranty Period : 30 Months after the date of delivery ] ] Consignee SSE/ELS/ITARSI, WCR Madhya Pradesh 2.00 Set UVAM Item ref. ( Item Id :- 2100193 - Set of Non-metallic Pipe (Smoke Detector Pipe) )
Shifting of Secondary substation at workshop to Frere Basin
Supply of Fire Alarm Detection System Supply of fire detection and alarm system comprising fire alarm control panel multi-area detection module multi sensor heat and smoke detectors break glass manual call points indoor and outdoor alarm hooters with AC shutdown interlock as per technical specification
SS BRACKETS AS PER BEML DRAWING MRS1 PROJECT
52518348 BRACKET, FIRE EXTINGUISHER-6KG (NON-UTO)
Periodical inspection of water based fire protection system including fire water pumping system and conducting mock drill within the premises of i. Lady Dufferin Victoria Hospital, ii. Calcutta Homoeopathic Medical College Hospital, and iii. IBTM
Inspection of entire hydrant network at least once in a month and submit report to PWD for any leakage or damage of hydrant / landing valves or any other type of valves and instruments (water pipe lines etc.) for taking further course of action to ensure proper functionality of the installed fire protection system. The scope also includes minor repair / rectification viz change of gland packings, nuts bolts and washers, gaskets etc of all type of valves and other instrument installed such as replacement of worn out or damaged gasket etc Major rectification such as replacement of damaged hand wheel, flanges, perforated pipes, pipe supports, valve seat rings etc. to be done on chargeable basis with prior intimation to PWD. During inspection of water network, the vendor shall drain out water from risers and sprinkler lines and recharge it with set pressure after proper flushing on quarterly basis. Inlet valves of hydrant risers to be kept close after completion of flushing and recharging of water to avoid any accidental discharge of water. The agency will held sole responsible if the Fire Hydrant Systems will not work in demand of emergency due to any leakage or pilferage of water from any parts of the fire hydrant system which has not brought into the knowledge of PWD by the working agency earlier i) In the premises of Lady Dufferin Victoria Hospital -------1No. ii) In the premises of Calcutta Homeopathic Medical College & Hospital, Maniktala---1 No. iii) In the premises of Central Blood Bank (IBTM&IH), Maniktala,...........1 No
Periodical inspection of water based fire protection system including fire water pumping system and conducting mock drill within the premises of of all buildings within the Hospital premises of Medical College Hospital, Kolkata etc.
Inspection of entire hydrant network at least once in a month and submit report to PWD for any leakage or damage of hydrant / landing valves or any other type of valves and instruments (water pipe lines etc.) for taking further course of action to ensure proper functionality of the installed fire protection system. The scope also includes minor repair / rectification viz change of gland packings, nuts bolts and washers, gaskets etc of all type of valves and other instrument installed such as replacement of worn out or damaged gasket etc Major rectification such as replacement of damaged hand wheel, flanges, perforated pipes, pipe supports, valve seat rings etc. to be done on chargeable basis with prior intimation to PWD. During inspection of water network, the vendor shall drain out water from risers and sprinkler lines and recharge it with set pressure after proper flushing on quarterly basis. Inlet valves of hydrant risers to be kept close after completion of flushing and recharging of water to avoid any accidental discharge of water. The agency will held sole responsible if the Fire Hydrant Systems will not work in demand of emergency due to any leakage or pilferage of water from any parts of the fire hydrant system which has not brought into the knowledge of PWD by the working agency earlier i) Hydrant network related to Pump House at the basement of 10 Storied Student Hostel building near Central reservoir----1No. ii) Hydrant network related to Pump room near Academic Building of MCH---1 No. iii) Hydrant network related to Pump room near Super Specialty Block---1 No
IPMS AND IBS
EL0003B-PS80610094302 LONISATION SMOKE DETECTOR