Loading…
Loading…
483 results • Best match
Fabrication and Supply of Exhibit Models
Working Exhibits of Condensed Aerosol Based Fire Extinguishing System 22 x 22 x 22 inches Working Exhibits of Condensed Aerosol Based Fire Extinguishing System 22 x 22 x 22 (inches)
80 MEN DOUBLE STOREY OR
Fire extinguisher Ball 1 POINT 30Kg STORE LIST ITEMS TO BE SUPPLIED AS PER TECHNICAL SPECIFICATIONS MENTIONED IN PDF DOCUMENT
Estimate for civil works, furniture and furnishing of Interstate Checkpost.
Providing & Fixing of 40mm Wall PUF(polyurethane foam ) insulated thick Panel with Prepainted Galvanised Ironsheet both sides in 40±2 Kg Density The PU panel shall be CFC( Chlorofluorocarbon)free and Zero Ozone depleting panel using N Pantane blowing agent & made out of continuous line running on uninterrupted power supply. Panel shall have pre coated GI sheet on both side of Polyurethane Foam confirming to IS 12436:1988. The pre coated sheet shall be of minimum 240 mpa steel grade confirming to IS 14246:1995 and shall have zinc coating of minimum 120 gsm as per IS : 277 : 1992, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 micron. The PPGI sheet shall have plastic protective guard film of minimum 25 microns to avoid scratches during transportation. The panels shall be vertically joined together by tongue and groove joints. The PU Foam shall be self-extinguishing, fire retardant type having minimum density of 40 Kg/Cu.mt (+, -2 Kgs). Surface of steel sheets has plain & light grooves to enhance their strength & aesthetic appearance complete with corner panels as required.
Taflon gland rope seal oil valve size 4X4 Sqmm, Taflon gland rope seal oil valve size 6X6 Sqmm, Taflon gland rope seal oil valve size 8X8 Sqmm, Taflon gland rope seal oil valve size 10X10 Sqmm, M S Coupling Bolt for DC seal of oil Pump full thread, ... with fitting for ... cm2 safety and ... Leak Detector , ... 50met, Fibre glass ...
Industrial grade H2 gas filling regulator for a generator of a 200MW unit Inlet pressure 125 150Kg cm2 Outlet pressure 3 4Kg cm2 safety and testing as per PESO guidelines As material description
Design, Supply erection commissioning and testing of water distribution system for Natural Draught Cooling Towers installed at 210MW Units Stage-I WTPS.
fire prone areas. They should also keep ready all the First Aid Fire Extinguishers / equipments&
Supply & Apply of M.S. Grills of various locations of Boiler, APH , ESP & Coal Mill Platform area for Unit No. 1, 2 & 3 of BMD I & Unit No. 4, 5 & 6 of BMD II at WTPS .
fire prone areas. They should also keep ready all the First Aid Fire Extinguishers/equipments &