Loading…
Loading…
116 results • Best match
Appointment of Consultant for Comprehensive Traffic Engineering, Analysis, Survey, Detailed Design and DPR preparation, Bid Doc preparation and Bid process management, Construction supervision for improvement and construction of Road Junctions PMRDA
Review of identified intersections using commercially available Map APIs, Submission of inception report & detailed work plan, Submission of junction 24 Hr turning movement data collection report and Total-Station topographic survey, Submission of Draft report along with data analysis, identification of deficiencies of various road furniture items based on operations and safety point of view, identification of mitigation measures along with CAD based geometric improvements for removal of congestion spots, Submission of the intersection Microsimulation Traffic Analysis for the identified junctions, Submission of Field Trial Summary Report, Submission of Final Junction Improvement report and drawings. Preparation of the detailed Design and Drawings, work Estimate & DPR, Technical Sanctions, Tender document and contractor appointment process, GFC Drawings to the Contractor, Day to day supervision, Project Management, Quality control and Contractor Billing, final completion Post-implementation monitoring (after PMRDA has implemented the final design) for impact measurement Additional Note: The consultant shall be paid fees for the scope mentioned in the tender under both pre-tender and post-tender activities. For post-tender activities, the consultant’s fee shall be calculated on the accepted tender amount of the contractor by applying the percentage of fees quoted by the consultant. For pre-tender activities, the consultant’s fee shall be paid based on the DPR and estimated cost, by applying the percentage of fees quoted by the consultant.
Consultancy for Design and Cost Estimation for construction of Km 5 (36 m Span), Km 6 (21 m Span) and Km 8 (8 m Span) of Peepna Kola Rankuna Gohali motor road in Vidhansabha Sult of District Almora
Feasibility Study (a) Geological investigation and submission of report. (b) Hydrological Investigation, Analysis and Design including preparation and submission of design report. (c) Topographic Survey, Traffic Survey (if required) and preparation of 4 no. Longitudinal Section & Cross Section for site section and preparation of final GAD after site selection and other drawings as required.