Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹32,000
Closing Date
13 Jun 2026, 12:00 pm5d left
Executive Engineer
Executive Engineer PD PWD Ranikhet
Consultancy for Design and Cost Estimation for construction of Km 5 (36 m Span), Km 6 (21 m Span) and Km 8 (8 m Span) of Peepna Kola Rankuna Gohali motor road in Vidhansabha Sult of District Almora
2026_pwd_96116_1
930(1)/7AC Dated 18-05-2026
Open Tender
Consultancy
180 days
Sult
As per Request for Quotation (RFQ)
2 documents required · 2 mandatory
₹1,770
EE PD PWD Ranikhet
₹32,000
Yes
30 May 2026
30 May 2026
13 Jun 2026
31 May 2026
13 Jun 2026
4 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Consultancy for Design and Cost Estimation for | |||||
| 1.01 | Feasibility Study
(a) Geological investigation and submission of report.
(b) Hydrological Investigation, Analysis and Design including preparation and submission of design report.
(c) Topographic Survey, Traffic Survey (if required) and preparation of 4 no. Longitudinal Section & Cross Section for site section and preparation of final GAD after site selection and other drawings as required. | 1 | Job | - | - |
| 1.02 | Geotechnical Investigation and Design of Foundation and Substructure Including vetting from reputed technical institute or agency finalized by the Client
(a) Geotechnical investigations, carrying out the required sub soil exploration and laboratory tests including preparation and submission of report.
(b) Preparation of Design and Drawings of Foundation and sub Structure, Bearings including submission of design report and drawings in hard and soft copy formats | 1 | Job | - | - |
| 1.03 | Design of Superstructure and Bearing including vetting from reputed technical institue or agency finalized by the Client
a) Preparation of Design and Drawings of Superstructure, Bearings including submission of design report and Drawings in hard and soft copy formats. | 1 | Job | - | - |
| 1.04 | Preparation of Reports
(a) Preparation and Submission of various DPR Reports (Inception Report, Preliminary Project Report, Draft Detailed project Report, Final Detailed Project Report)
Preparation and Submission of various Reports- Economic Evaluation Report (EVR) and Rapid Environmental Assesment (REA) | 1 | Job | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
RFQ.pdf
Tender Documents • 1.26 MB
BOQ_113594.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid