| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.5 LAdmitted-Fee/PreQual/Technical/Finance 14 C ARAWALI ENCLAVE GMS ROAD GMS ROAD DEHRADUN UTTARAKHAND 248001 | DEHRADUN | UTTARAKHAND | 248001 | ₹12.5 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹13.1 LAdmitted-Fee/PreQual/Technical/Finance 672 SST NAGAR PATIALA PUNJAB 147001 | PATIALA | PATIALA | PUNJAB | 147001 | ₹13.1 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹15 LAdmitted-Fee/PreQual/Technical/Finance | ₹15 L | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹19.4 LAdmitted-Fee/PreQual/Technical/Finance | ₹19.4 L | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
| Sl No | Description | Qty | Unit | TECHNICAL CONSULTANCY SERVICES L1 | Incontext Design Private Limited L3 | Khanna Designers & Consultants Pvt.Ltd. L2 | FESTAL CONSULTING ENGINEERS PRIVATE LIMITED L4 |
|---|---|---|---|---|---|---|---|
| .01Note- The Contractor shall quote his/ their rates without GST. GST will be paid extra by the Department as per prevailing rate at the time of payment. | |||||||
| 1.00Consultancy for Design and Cost Estimation for | |||||||
| 1.01 | Feasibility Study
(a) Geological investigation and submission of report.
(b) Hydrological Investigation, Analysis and Design including preparation and submission of design report.
(c) Topographic Survey, Traffic Survey (if required) and preparation of 4 no. Longitudinal Section & Cross Section for site section and preparation of final GAD after site selection and other drawings as required. | 1 | Job | - | 3,00,000 ₹3,00,000 | 1,50,000 ₹1,50,000 Lowest | 2,71,274 ₹2,71,274 |
| 1.02 | Geotechnical Investigation and Design of Foundation and Substructure Including vetting from reputed technical institute or agency finalized by the Client
(a) Geotechnical investigations, carrying out the required sub soil exploration and laboratory tests including preparation and submission of report.
(b) Preparation of Design and Drawings of Foundation and sub Structure, Bearings including submission of design report and drawings in hard and soft copy formats | 1 | Job | 7,10,000 ₹7,10,000 | 4,00,000 ₹4,00,000 | 3,90,000 ₹3,90,000 Lowest | 9,68,867 ₹9,68,867 |
| 1.03 | Design of Superstructure and Bearing including vetting from reputed technical institue or agency finalized by the Client
a) Preparation of Design and Drawings of Superstructure, Bearings including submission of design report and Drawings in hard and soft copy formats. | 1 | Job | 4,50,000 ₹4,50,000 Lowest | 5,50,000 ₹5,50,000 | 6,00,000 ₹6,00,000 | 5,81,320 ₹5,81,320 |
| 1.04 | Preparation of Reports
(a) Preparation and Submission of various DPR Reports (Inception Report, Preliminary Project Report, Draft Detailed project Report, Final Detailed Project Report)
Preparation and Submission of various Reports- Economic Evaluation Report (EVR) and Rapid Environmental Assesment (REA) | 1 | Job | 86,500 ₹86,500 Lowest | 2,50,000 ₹2,50,000 | 1,70,000 ₹1,70,000 | 1,16,176 ₹1,16,176 |
Tender Value
Refer Docs
EMD Value
₹32,000
Closing Date
19 Jun 2026, 12:00 pmClosed
Executive Engineer
Executive Engineer PD PWD Ranikhet
Consultancy for Design and Cost Estimation for construction of Km 5 (36 m Span), Km 6 (21 m Span) and Km 8 (8 m Span) of Peepna Kola Rankuna Gohali motor road in Vidhansabha Sult of District Almora
2026_pwd_96116_1
930(1)/7AC Dated 18-05-2026
Open Tender
Consultancy
Item Wise
180 days
Sult
As per Request for Quotation (RFQ)
2 documents required · 2 mandatory
₹1,770
EE PD PWD Ranikhet
₹32,000
Yes
22 Jun 2026
30 May 2026
19 Jun 2026
31 May 2026
19 Jun 2026
4 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Consultancy for Design and Cost Estimation for | |||||
| 1.01 | Feasibility Study
(a) Geological investigation and submission of report.
(b) Hydrological Investigation, Analysis and Design including preparation and submission of design report.
(c) Topographic Survey, Traffic Survey (if required) and preparation of 4 no. Longitudinal Section & Cross Section for site section and preparation of final GAD after site selection and other drawings as required. | 1 | Job | - | - |
| 1.02 | Geotechnical Investigation and Design of Foundation and Substructure Including vetting from reputed technical institute or agency finalized by the Client
(a) Geotechnical investigations, carrying out the required sub soil exploration and laboratory tests including preparation and submission of report.
(b) Preparation of Design and Drawings of Foundation and sub Structure, Bearings including submission of design report and drawings in hard and soft copy formats | 1 | Job | - | - |
| 1.03 | Design of Superstructure and Bearing including vetting from reputed technical institue or agency finalized by the Client
a) Preparation of Design and Drawings of Superstructure, Bearings including submission of design report and Drawings in hard and soft copy formats. | 1 | Job | - | - |
| 1.04 | Preparation of Reports
(a) Preparation and Submission of various DPR Reports (Inception Report, Preliminary Project Report, Draft Detailed project Report, Final Detailed Project Report)
Preparation and Submission of various Reports- Economic Evaluation Report (EVR) and Rapid Environmental Assesment (REA) | 1 | Job | - | - |
stage.html
html • 0.02 MB
finance_113594.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
RFQ.pdf
Tender Documents • 1.26 MB
BOQ_113594.xls
BOQ • 0.28 MB
corrEMDexemption.pdf
PDF • 1.02 MB
fcorrbridge.pdf
PDF • 0.37 MB
corrpeepnabridge.pdf
PDF • 0.20 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].