IMPROVEMENT OF ROAD FROM GURUDEV ROAD TO ICAI BHAWAN ROAD AND AWADHPURI ROAD UNDER ZONE-06.
CROSSING BEAUTIFICATION WORK HORTICULTURE AND LANDSCAPPING (For Four Crossings)
CA NO CE CHZ PAT T 19 2025 26 PROVN OF OR MARRIED ACCN AT NABHA MILITARY STATION
Supply and mixing properly manure/cowdung with excavated earth to make mixture of earth and manure to a ratio of 2:1 and surface dressing the area to true level and required slope for grass plantation or to make plant/flower beds, complete all as directed.
CIVIL WORK
Plantation of Trees, Shrubs, and Hedge at site i/c watering and removal of unserveiceable material’s as per direction of officer in charge (excluding cast of plant & water) Hedge Plant / Ground cover
REPAIRS TO SEEPAGE/ LEAKAGE, SUNKEN AND CONNECTED ALLIED WORKS AT CERTAIN BLDGS AT AF STN TUGHLAKABAD UNDER GE (AF) TUGHLAKABAD.
Material and labour for roof top surface for roof treatment using application of water proofing treatment by authorised applicator complete all as specified and as directed and comprising of the followings:- (a) Preparation of roof top surfaces and cleaning all the dust and loose material by brush/blower/grinder including removing of vegetation/plantation from the surface and providing and applying single component elastic cold applied polyurethane modified acrylic roofing system, co-elastic technology (CET) based on modified polyurethane and fully fibre reinforced, having sun reflectivity index (SR) of 109 on top of concrete roof surfaces. (b) All cracks up to 3 mm at corner joints, channel and parapets shall be treated with crack seal. (c) Brushing roof surface with neat cement slurry at the rate of 3.00kg of cement per Sqm after cleaning the concrete surface. (d) PCC 1:2:4 type B0 using 12.5mm graded crushed stone aggregate of desired thickness as directed to maintain to slope/gradient and finishing surface of concrete topping even and smooth without using extra cement. (e) Laying 10mm thick plastering in CM 1:3 on PCC padding with water proofing compound @ 3% by weight of cement, surface finished even and smooth without using extra cement all as per manufacturer's instructions. (f) Applying three coats including one coat of primer of polyurethane membrane having coverage @ min 0.75kg/m2 and dilution up to 10% and laying reinforced fiber net and applying two coats of polyurethane membrane @ total consumption 2 kg/m2 in two coats for maintaining minimum dry film thickness 1.5mm and elongation at break of free film of approx 350%.
WORK NO. 05 KRISHNA VIHAR AWASIYA YOJNA ME SACHIV MAHODAYA KE NAVEEN BHAVAN ME UDHANIKARAN KA KARYA
HORTICULTURE AND LAND SCAPING : - Trenching in ordinary soil up to a depth of 60 cm including removal and stacking of serviceable materials and then disposing of surplus soil, by spreading and neatly levelling within a lead of 50 m and making up the trenched area to proper levels by filling with earth or earth mixed with sludge or / and manure before and after flooding trench with water (excludingcost of imported earth, sludge. DSR 2020 (H) 2.1
PROVN OF 02XSTP AT JNE COMPLEX AND 01 NO STP AT OTHER LOCATION UNDER GE (N) UDHAMPUR
Designing (Hydraulically . Structurally and aesthetically), Providing constructing hydraulic testing, commissioning of sewage treatment plant (450 KLD Capacity) consisting of coarse bar screening chamber (RCC) with steel screening (Manual), receiving sump RCC, Submersible pumps in receiving sump, stilling chamber in RCC, fine bar screen chamber ( Manual) RCC with steel screen, oil & grease remover (RCC), Grit separator equalization tank (two tank of 50% capacity each), air grid for equalization tank, feed pumps 02 No's, moving bed Bio reactor (s) with plastic media of appropriate density , size and quality to keep very high MLSS greater than 15000mg / litre). Air blowers for MBBR (02 No's), tube settlers assay, sludge pump screw type 02 No's Sludge dewatering centrifugal, sludge holding tank, Air grid for sludge holding, chlorine dozing system chlorine contact tank, foundation for all E/M equipment's, associated piping work with reqd valves, gates, drains, pathways, electrical control panel with inter connecting cable, spare parts for 2 years of operation, etc. complete as turned key job with all involved civil, electrical, digital and mechanical works as per detail specification for civil, electrical and mechanical components with all duties and taxes complete. Also refer important notes below:-) for Tertiary treatment it also include filter feed tank of RCC, Filter feed pump, Dual media filter, activated carbon filter, treated water tank in RCC. Treated water can also been used for irrigation, horticulture, fire fighting and MT wash. (Contd.../)