Loading…
Loading…
2,185 results • Best match
Tree Plantation, Drilling of New Borewell at Kovai garden 1 in Ward No 90, South Zone.
Labour Charges for Tree Plantation (Per day outern for one Labour = 20nos) as per the departmental of direction officers.
Tree Plantation and Drilling of new borewell at Sameem Garden in Ward No 89, South Zone.
Labour Charges for Tree Plantation (Per day outern for one Labour = 20nos) as per the departmental of direction officers.
Tree Plantation, Drilling of new borewell at Sri Lakshmi Nagar in Ward No 90, South Zone.
Labour Charges for Tree Plantation (Per day outern for one Labour = 20nos) as per the departmental of direction officers.
Day to Day Civil and Horticulture Maintenance of BSNL Bhawan Premises at Unit-II Ashok Nagar Bhubaneswar for the FY-2026 27
Carrying out horticulture maintenance operation of BSNL Bhawan compund and its front area consisting of : (1)Watering of plants daily, (2)Cultivation and weeding of planter beds and lawns fortnightly. (3)Cleaning of planter beds daily, (4)Applying manure/ Fertiliser/ Pesticide/ Termicide as per requirement, (5)Planting of seasonal flower plants as per approved pattern, (6)Top dressing of planter boxes etc. with soil &/or manure, (7) Repair and replacement of diseased/ dead plants, (8)Levelling of planter beds etc. as per requirement, (9)Care and protection of outdoor and indoor potted plants and trees as needed, (10) providing all T&P, flexible PVC pipes with accessories for watering etc complete as per direction of Engineer-in-charge. The Contractor shall use departmental water free of cost. The cost of new plants, manure/ fertiliser, presticide/ termicide, good eath shall be paid by the department.
Horticulture development and maintenance work of aperiod of two years on the central verge and both sides of the newly constructed 18, 24, 30, and 45 meter wide roads in Rajnagar Extension.
Complete maintenance of the entire garden features having as per yard stick in the garden area i.e. lawn trees, shrubs, herbs, edge, flower beds, foliages, creepers etc. including hoeing,weeding pruning replacement of plants, gap filling, watering, mowing of lawn, grass cutting by lawn mover and brush cutter, removal of garden waste, applying insecticide, pesticide & fertilizers (whenever required) top dressing of lawn with good earth and menure and maintenance of other garden related works as directed by office-in-charge (Cost of Good Earth, Manure, Fertilizer, Insecticide, Pesticide will be provided by the Department & lawn mover and brush cutter with fuel, other T & P material/articles shall be provided by the contractor.) (2.40x0.90=2.16x111/100 = 2.39) (Qty for 24 month & 23880 sqm per month = 576120.00 sqm) 2.40.5 DSR. 2020
Raising of Monsoon Plantation Raising of Causality replacement seedlings 10X16 (ANR)-2026-27 and Maintenance of one year old plantation during 2027-28, at Koyilaraghatta RFNew Block-8 of 25 Ha in Hadagali Range (KMERC) (UNIT-No-08) (Others)
Raising of Monsoon Plantation Raising of Causality replacement seedlings 10X16 (ANR)-2026-27 and Maintenance of one year old plantation during 2027-28, at Koyilaraghatta RF New Block-8 of 25 Ha in Hadagali Range (KMERC) (UNIT-No-08) (Others)