PROVISION OF STP FOR AVA HILL COMPLEX AND MANDIR LINE COMPLEX AT WELLINGTON UNDER GE WELLINGTON
SEWAGE TREATMENT PLANT (STP) AT AVA HILL Designing (hydraulically, structurally & aesthetically), providing, constructing, hydraulic testing, commissioning and giving satisfactory trials of STP of capacity 75 cum/day (KLD) with SCADA Compliant MCC Panel with OCEMS (suiting to the climatic conditions of the site) consisting of RCC Collection Sump, Inlet Chamber, Fine bar Screen chamber (manual) with steel screen, Oil & Grease Remover, Grit separator, Equalization Tank (2 Tanks of 50% Capacity each), Air Grid for Equalization Tanks, Feed Pumps (2 Nos), Moving Bed Bio Reactor (s) with plastic media (of appropriate density, size and quantity to keep very high MLSS > 15,000 mg/lit), Air Blowers for MBBR, Tube Settler assembly, Sludge Drying Bed of appropriate size, Chlorine Dozing System, Chlorine contact tank, Treated Water Collection Sump, Foundation for all E/M equipments, Associated piping work with required valves, gates, drains, pathways, Electrical control Panel with interconnecting cable, spare parts for 2 years of operation, etc. complete as turnkey job with all involved civil, electrical, digital and mechanical works as per detailed specifications for civil, electrical and mechanical components with all duties and taxes complete. (Also refer important Notes below). For tertiary treatment it also includes Filter Feed Tank, Filter Feed Pumps, Dual Media Filter, Activated Carbon Filter, Treated water Tank. Treated water can be used for irrigation, horticulture, fire fighting and MT wash at Ava Hill complete all as directed.
General-Xanadu Additional works Renovation of toilets kitchen work area and out house at Xanadu Bungalow official residence of Honourable Minister for Health and Devaswom Civil work
15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar
GENERAL Kunnathur LAC 25 26 CSIND Renovation of Pezhumthuruth Boat terminal in Munrothuruth gramapanchayath in Kunnathur LAC General Civil Work
15.19:Dismantling steel work manually / by mechanical means in built up sections without dismembering and stacking within 50 metres lead as per directions of Engineer -in-Charge.
GENERAL Kunnathur LAC 25 26 CSIND Renovation of Perungalam Boat terminal in Munrothuruth gramapanchayath in Kunnathur LAC General Civil Work
15.19:Dismantling steel work manually / by mechanical means in built up sections without dismembering and stacking within 50 metres lead as per directions of Engineer -in-Charge.
GENERAL Kunnathur LAC 25 26 CSIND Renovation of Pattomthuruth Boat terminal in Munrothuruth gramapanchayath in Kunnathur LAC General Civil Work
15.19:Dismantling steel work manually / by mechanical means in built up sections without dismembering and stacking within 50 metres lead as per directions of Engineer -in-Charge.
DEPOSIT-Fire and Rescue DG Office-Store Renovation-General Civil Work
15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.