Loading…
Loading…
3,504 results • Best match
D.B.H.S.S. Cheriyanad in Mavelikkara Group - Reconstructing fallen down portion of compound wall at West side and reconstructing the leaned portion of compound wall at South East side of school compound
Reconstructing fallen portion of compound wall -Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar.
Construction of Sitting Shed near Shiv Temple at Sector C Sainik Colony Jammu
Demolishing R.C.C. Work manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge:
Please refers to BOQ
Demolishing brick work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: In lime mortar
REPAIR /MAINT TO CERTAIN ROADS AND ROAD FURNITURE IN POCKET B AT JASAI MIL STATION UNDER GE (A) BARMER
M&L for Preparation of black top surfaces of any type by brushing with wire brushes for removing cake mud etc. sweeping with brooms and finally fanning the cleaned surface with gunny bags to removed all loose dirty etc.Applying evenly a tack coat of cationic butumen emulsion (RS-1) confirming to IS: 8887 at a rate of application of 0.25 Kg/Sqm on bituminous surface as specified in table 500-5 of MoRTH specification for road and bridge works 2013, using mechanical sprayer after cleaning of esisting surface as specified and directed.
PROVISION OF STP FOR AVA HILL COMPLEX AND MANDIR LINE COMPLEX AT WELLINGTON UNDER GE WELLINGTON
SEWAGE TREATMENT PLANT (STP) AT AVA HILL Designing (hydraulically, structurally & aesthetically), providing, constructing, hydraulic testing, commissioning and giving satisfactory trials of STP of capacity 75 cum/day (KLD) with SCADA Compliant MCC Panel with OCEMS (suiting to the climatic conditions of the site) consisting of RCC Collection Sump, Inlet Chamber, Fine bar Screen chamber (manual) with steel screen, Oil & Grease Remover, Grit separator, Equalization Tank (2 Tanks of 50% Capacity each), Air Grid for Equalization Tanks, Feed Pumps (2 Nos), Moving Bed Bio Reactor (s) with plastic media (of appropriate density, size and quantity to keep very high MLSS > 15,000 mg/lit), Air Blowers for MBBR, Tube Settler assembly, Sludge Drying Bed of appropriate size, Chlorine Dozing System, Chlorine contact tank, Treated Water Collection Sump, Foundation for all E/M equipments, Associated piping work with required valves, gates, drains, pathways, Electrical control Panel with interconnecting cable, spare parts for 2 years of operation, etc. complete as turnkey job with all involved civil, electrical, digital and mechanical works as per detailed specifications for civil, electrical and mechanical components with all duties and taxes complete. (Also refer important Notes below). For tertiary treatment it also includes Filter Feed Tank, Filter Feed Pumps, Dual Media Filter, Activated Carbon Filter, Treated water Tank. Treated water can be used for irrigation, horticulture, fire fighting and MT wash at Ava Hill complete all as directed.
General-Xanadu Additional works Renovation of toilets kitchen work area and out house at Xanadu Bungalow official residence of Honourable Minister for Health and Devaswom Civil work
15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar