Loading…
Loading…
3,489 results • Best match
REPAIR/ MAINT OF CERTAIN INTERNAL ROAD OF ZONE-I AND II IN AOR OF AGE B/R-I UNDER GE PANAGARH
M&L Bituminous semi dense asphaltic concrete, 40mm consolidated thickness with minimum 5.5% binder with paving bitumen (VG-30) [Mix Design criteria as per SSR Part-I Clause 20.B.2.11, or as per MoRTH by Marshal method (Ref table 500-12 to 500-16)] coarse aggregate, fine aggregate, filler cement (OPC - 43 Gde) as per recommendation of design by weight of total mix from hot mix plant, rolled by with 8 to 12 tonne vibrating (tandom) road roller to confirm uniform surface and compacted to required camber and gradient including preparing black top surfaces by brushing with wire brushes for removing caked mud etc., sweeping with brooms and finally fanning the cleaned surface with gunny bags to remove all loose dirt etc. and applying evenly a tack coat of rapid setting cationic bitumen VG-10 conforming to IS : 73 at a rate of application of 0.3-0.4 kg/sqm on bituminous surface as specified in Table 500-5 of MoRTH Specification for Road and Bridge Works 2013, using mechanical sprayer, complete with mechanical paver, complete all as specified and directed. [Note : (i) Work shall be executed after approval of design mix of semi dense asphaltic concrete by GE.(ii) Calibration of Hot Mix Plant shall be submitted to Engr-in-Charge for approval.(iii) Payment shall be made to Contractor after submission of approved design mix, Bitumen Extraction Report, Road Roller Register & Calibration Report.(iv) Exact qty of binder to be used shall be ascertained by Design Mix.(v) Minimum 5.5% binder shall be used. However, in case more than 5.5% of binder content is required as per design mix, the same shall be provided by the contractor at no extra cost to dept.(vi) All testing charges shall include in unit rate quoted by bidder.]
Setting up of Flatted Factory Complex at Chabua, Dist. Dibrugarh
Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge.
Repairing, Raising up of Manholes, Road Gullies alongwith Providing and Fixing of missing Road Gully/ Manholes Cover and Frames for Vikas Marg Sector-48 to 50, Sector-31 and 32 Outer Main Road and Various NR Buildings (NCC, GRIID, Schools, Police Sta
Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge.
Construction of retaining wall in connection with upgradation of 66kv sc to 110kV DC from Elachola to Malappuram
Earth work excavation by mechanical means (Hydraulic excavator) / manual means over areas ( exceeding 30 cm depth,1.5m in width as well as 10 sqm on plan), including getting out and disposal of excavated earth lead up to 50m and lift up to 1.5m as directed by Engineer In Charge. Hard rock (blasting prohibited)
Construction of retaining wall back lawn side at Hotel Dhauladhar Dharamshala (H.P)
Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m Ordinary rock as per the diretion of Engineer in Charge at site.
BOQ
Carriage of Stone Aggregate from source to site of work by Mechanical transport including Loading /Unloading complete for an Avg. distance 18 km by MT