Loading…
Loading…
3,540 results • Best match
insulation Repair works in boiler area at CPP
TGGENCO-YTPS-Providing Rest room and toilets at wagon tippler 3 and 4 area in Coal Handling Plant of (5x800MW) Yadadri Thermal Power Station, Veerlapalem(V), Dameracherla(M), Nalgonda Dist.
with all contingent civil, including staff quarter, electrical, mechanical, piping and instrumentation works with three months trial run including three year defect liability period and operation and maintenance of entire system for 5 years.
Construction, Site development, testing, commissioning and giving satisfactorily trials of 1.4 MLD STP of SBR technology which can be accommodated in limited identified land space consisting of Primary, Secondary and Tertiary Treatment Units as per the requirement of designed CPHEEO norms relevant IS codes etc. necessary piping work with required valves, gates, drains, path Ways, Administration Block cum Laboratory, Laboratory Equipments, Internal Roads, Pathways, Compound Wall, Tools and plants, Treated effluent arrangements complete as turnkey job with all involved Civil, electrical, (Including transformer) Instrumentation and mechanical works Inclusive of following Items, units as per detailed specifications for civil, electrical, Instrumentation and mechanical components complete to achieve latest CPCB/ HPPCB / CPHEEO discharge standards pH 6.5- 8.5, BOD 10ppm, COD50ppm, TSS 10ppm, NH4-N 5ppm, N-Total10ppm, Total Phosphorus (PO4-P) =1 ppm, Faecal Coliforms 100 MPN/100ml and Total residual Chlorine =1 ppm to get recyclable quality of water for Industrial / agricultural purposes. .All units shall be interconnected with administration building by suitable or RCC overhead walkways, boundary wall of average 4.0 mtr complete fencing (Campus should covered with boundary wall and fencing) at the STP component as per the scope and confirming norms as mentioned above. The plant should be completely automated with PLC - SCADA complete from Primary, secondary and Tertiary treatment etc price of items including GST and payment will be released on prorata basis complete as per Direction of Er-in Charge.(Schedule -B)
MECHANICAL WORKS
Design, drawing, fabrication, supply, erection, testing and commissioning of structural steel hoist bridge, Rail support Girder(for Gantry crane) & cat walk/walkway bridge on dam/barrages and canal/rivers consisting of foundation bolt assembly, base plate, columns, beams, bracings, stiffeners, ties, chequered plate covering, hand railing, staircase etc., with all accessories including cost of all materials, machinery, labour, welding, finishing, etc., complete as per specifications and drawings with all leads and lifts (without painting ).
Laying of Dedicated pipe line for improvement of functionality and Design, Supplying. Fabrication, Erection Commissioning including 3 (three) months Trial Run of 135m3 hr. capacity Pressure type IRON ELIMINATION Plant with backwash water disp
cushion of 1.10mtr. from the top of pipe line including making interconnection with distribution pipes etc. all complete as per drawing direction and satisfaction of the E.I.C. N.B. i) Manufacturer’s test certificate for UPVC pipe & specials to be produced before laying of pipe line. ii) 3rd party inspection of UPVC pipe & specials to be done by CEPET or (India) SGS/NTH Kolkata or as per direction of EIC as per approved vender list. iii)No part payment at any stage on account of supply of materials shall be entertained. iv)Payment will be made on actual consumption of materials. v)UPVC pipes for the works to be supplied as per approved vendor list and as per direction & satisfaction of EIC. No pipes will be allowed beyond recommendated vendor list. vi)Submission of drawing of pipe line with statement of materials consumed between node to node points against each R.A. & final bill.if so. vii) Any deviation from required clear cover of 1.10mtr.due to site adverse condition, prior permission is to be obtained from EIC and payment for such work will be made on prorate basis over the rate of entire item. viii)All pipe connection shall be completed in all respect and as per directionof EIC. Decision of EIC in this respect is final & binding. In case of any deviation/or any left out pipe connections an amount of Rs.10,000.00 for each pipe connection will be realized/recovered from the bill. (A) Pressure Rating : Class - III (ii) Laying of pipe line including cost of pipe & fittings/specials but excluding cost of valves.
Custom Bid for Services - MRPL Tender No 3420000141 and Service Items in Annexure B complete items from Sl no 1 to 13 for fabrication, welding with erection of pipeline & structural supports as per SOW and BOQ and in GEM unit price breakup to be ... and Overhauling Service
welding with erection of pipeline & structural supports as per SOW and BOQ and in GEM unit price breakup to be pro.. Similar Category Repair and Overhauling Service