Loading…
Loading…
3,540 results • Best match
BALANCE/MODIFICATION WORKS MECHANICAL/PIPING
Mechanical work
Taking out old existing unservicable damaged draw/flap gate shutter of distributories/ branch canal/minor canal/channel completely after disengaging from hoisting system completely for installation of new gate shutter. The work includes cutting of gates into suitable pieces by gas cutting, removing the same by mechanical means or suitable crane, stacking all the pieces at the suitable place or departmental godown or as directed by the Engineer in charge. The cost includes cost of man power employed for dismantling and cost of consumables like oxygen, accetylene gas, hire charges of machineries, like chain pulley block, gas set, tools & tackles, scaffolding and safety equipments etc including carriage loading & unloading with all lead & lift.
Mechanical work
Servicing of headstock assembly i.e. opening the hand wheel from screw rod, including opening the thrust bearing from top and bottom thrust plate of bearing housing, nut, coller etc and cleaning all the components with the help of Kerosine and emery paper and re-fitting the same including changing necessary nuts & bolt after greasing the thrust bearing if Ok otherwise replaced by new one (excluding the cost of bearing, supplied separately) and fileing work if required for fixing to the pedestal upto the satisfaction of E.I.C. The cost includes cost of materials, man poweremployed, kerosene, grease, consumables like emery paper, cloths, blots & nuts, hire chargesof tools & tackles etc
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Power House Equipment, Contingency work of feeding auxiliaries of milling circuit for handling sticky wet coal of Unit# 3&4, 2x210MW PTPP, Parichha.; Serv..
Contingency work of feeding auxiliaries of milling circuit for handling sticky wet coal of Unit# 3&4
Maintenance of Sewage Treatment Plant of KAP 3 rd Battalion, Adoor, Pathanamthitta - Revamping of the existing Sewage Treatment Plant having water consumption 98 Kilo Litre /Day for KAP 3rd Battalion, Adoor, Pathanamthitta)-General Mechanical Work
OD35136/2025-2026: fabrication, erection including labour charge for all pipe lines, pipe fittings etc. of existing 98 KLD sewage water treatment plant
Selection of a Project Management Consultant PMC for Construction of Rail Connectivity and Railway Siding at Sawarla Village for the Proposed Coal Handling Plant CHP with SILO System of Kolar Pimpri Expansion Opencast Mine, Wani North Area, WCL