Loading…
Loading…
25,297 results • Best match
FABRICATION OF TEST CONE INLET AND OUTLET PIPE -02 ITEMS
Custom Bid for Services - REPAIR/REPALCEMENT OF DAMAGED SAFETY STRUCTURAL FABRICATION/ERECTION OF WORKING PLATFORM(CCM) Similar Category Repair and Overhauling Service
Custom Bid for Services - REPAIR/REPALCEMENT OF DAMAGED SAFETY STRUCTURAL FABRICATION/ERECTION OF WORKING PLATFORM(CCM) Similar Category Repair and Overhauling Service
Mechanical maintenance works at Valuthur GTPS Phase I for a period of 1 year
Charges for periodical maintenance of Gas Turbine ventilation fans, blowers... minor works related to the mechanical maintenance as directed by the Engineer ...
Removal of accumulated ash/ground ash from ESP Hoppers area, Buffer Hoppers area and remote silo area at ash handling plant of Stage-IV/Dr.MVR RTPP and the same ash should be transport and dumped at an ash pond area of Dr.MVR RTPP for six months. i.e., from 01.04.2026 to 30.09.2026 as and when required in the year 2026-27.
Fabrication and erection of duct and its structural supports for ventilation in additional chiller area at KAPS-3 and 4
SUPPLY, INSTALLATION, FABRICATION, ERECTION, TESTING AND COMMISSIONING OF MECHANICAL WORKS ALONG WITH ASSOCIATED PIPING FOR THE AMBIENT AIR HEATER PROJECT AT INDIANOIL PETRONAS PRIVATE LIMITED
Piping and Mechanical WORKS - PRODUCT , WATER, AIR, ...
Custom Bid for Services - MEGA CONTRACT FOR ASH HANDLING SYSTEM OF NTECL VALLUR Similar Category Operation and Maintenance Power House/Power Plant
Custom Bid for Services - MEGA CONTRACT FOR ASH HANDLING SYSTEM OF NTECL VALLUR Similar Category Operation and Maintenance Power House/Power Plant
KTPS VI Stage CAM Transportation of fly ash and wet ash from various locations in Ash handling system by means of manual loading and disposing to Ash Pond or low laying areas in KTPS complex as and when required during the period from 01.04.2026 or from actual date of commencement to 31.03.2027
Preliminary inspection for condition assessment of Steel Structures of Ash Handling ST 1 and ST 2 at NTPC Barh
CAM-Divn:Angular rotation of 300NB dia MSERW ash slurry disposal pipelines -1 2 and 3 to an angle 120degree from ash slurry pump house to power house boundary wall as and when required during the year 2026 27 in wet ash handling system