Work contract for expert servicing of M/s Limitorque make electrical valve actuator installed at boiler and turbine side of 210 MW ATPS, MPPGCL, Chachai
1 Expert servicing of M/s Limitorque make electrical valve actuators installed at boiler and turbine side of 210 MW ATPS, MPPGCL, Chachai during AOH-26. Item1 15 Days 0 Excess(+) Full Conversion INR 1.01 Supplying, Conveying and fixing spls. Including eart item1 123.223 Nos
Work Contract for complete Co-Incineration of Spent Ion Exchange Resin with Coal in Boiler PH-I (2x600 MW Subcritical Units) at SSTPP, MPPGCL, Dongalia.
Work Contract for complete Co-Incineration of Spent Ion Exchange Resin with Coal in Boiler PH-I (2x600 MW Subcritical Units) at SSTPP, MPPGCL, Dongalia.
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Expert/supervision services towards CW pump VT-44-90 & other vertical turbine pumps make WPIL Ltd; Service Provider
and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Expert/supervision services towards CW pump VT-44-90 & other vertical turbine pumps make WPIL Ltd; Service Provider
Work contract for fabrication and erection of platform for flue gas duct repairing and maintenance of LRSB of Boiler furnace at 1x210 MW ATPS, MPPGCL, Chachai.
Work contract for fabrication and erection of platform for flue gas duct repairing and maintainance of LRSB of Boiler furnace at 1x210 MW ATPS, MPPGCL, Chachai.
RMO Electrical and Mechanical Services at UTCS Building Vishwas Nagar Delhi (Sub Head- Miscellaneous Electrical Works in different location.)
Rewinding of 7.5 HP capacity 3 phase 415 volt monoblock pumps with superior quality and copper winding wire of suitable gauge including cutting, cleaning the existing burnt/damaged winding, dismantling and reassembling the same after rewinding testing, commissioning i/c Pdg & Replacement of minor/major spares parts of mono block motor and pump such as rotor shaft natural filling, grinding, polishing, balancing, ccaping Kit, O-rong 2 Nos., O seal-2 Nos. upper/lower GM bearing bush, rotor shaft grinding and balancing parts, after repairing works, neck ring, inter bowel bush, stainless, steel sleeve, inter shaft key, assembling of pumps parts after repairing works, painting, testing i/c carrying from site to workshop & back to site complete etc as required i/c less credit on buyback of vurnt copper wires.
repairs to 100 KVA electric sub-station and allied electro-mechanical works at Lift irrigation station Pindi Sarochana Old