Loading…
Loading…
20,383 results • Best match
Annual Maintenance estimate for water supply and Sewerage scheme in Auto Market, Hansi for the year 2025-26.
... for examine the possibilities for construction of 12.00 MLD Canal based Water Treatment Plant(WTP) instead of 6.00 MLD WTP (as per decision of the competent authority) in Hansi, Sector-3, ...
Construction of Retaining wall and drain behind S-II qtrs. BBMB colony under Chief Engineer(Gen) Sundernagar.
Excavation work by mechanical means (Hydraulic excavator)/ manual means infoundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including gettingout the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m.:-Ordinary rock
Widening and Improvement of road at Rd 21/300 to 21/370
Cutting and disposal of earth work in by mechanical in all heights and depths in all kinds of soils, including saturated soils comprising of pick work, jumper work and blasting work both in soft and hard rock with chiseling and wedging out of rock (where blasting is ...
refer BOQ
Carriage of cement,stone blocks, G.I ,HDEP,C.I ,A.C ,Stainless steel,steel,C.G.I sheets and CC pipes below 100mm dia and other heavy material from Nerest source to road side of work by Mechanical Transport including loading unloading and stacking for an av. Distance as below mentioned :- 01 KM
Left over work of cutting, excavation, retaining walls and shifting of sewer line near IHSDP Site at dharamshala
Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains , including dressing of sides and ramming of bottoms, including getting out the excavated soil/ordinary rock and disposal of surplus excavated soils upto all lead and lift as per direction of Engineer In Charge.(Ordinary Rock/Soil)
refer BOQ
Carriage of cement,stone blocks, G.I ,HDEP,C.I ,A.C ,Stainless steel,steel,C.G.I sheets and CC pipes below 100mm dia and other heavy material from Nerest source to road side of work by Mechanical Transport including loading unloading and stacking for an av. Distance as below mentioned :- 01 KM