Loading…
Loading…
20,512 results • Best match
REFER BOQ
Carriage of cement,stone blocks, G.I ,HDEP,C.I ,A.C ,Stainless steel,steel,C.G.I sheets and CC pipes below 100mm dia and other heavy material from Nerest source to road side of work by Mechanical Transport including loading unloading and stacking for an av. Distance as below mentioned :- (a) 01KM
Please refer BOQ
Carriage of cement,stone blocks, G.I ,HDEP,C.I ,A.C ,Stainless steel,steel,C.G.I sheets and CC pipes below 100mm dia and other heavy material from Nerest source to road side of work by Mechanical Transport including loading unloading and stacking for an av. Distance as below mentioned :- 01 KM
Refer BOQ
Carriage of cement,stone blocks, G.I ,HDEP,C.I ,A.C ,Stainless steel,steel,C.G.I sheets and CC pipes below 100mm dia and other heavy material from Nerest source to road side of work by Mechanical Transport including loading unloading and stacking for an av. Distance as below mentioned :- 01 KM
Refer to BOQ
Carriage of cement,stone blocks, G.I ,HDEP,C.I ,A.C ,Stainless steel,steel,C.G.I sheets and CC pipes below 100mm dia and other heavy material from Nerest source to road side of work by Mechanical Transport including loading unloading and stacking for an av. Distance as below mentioned :- (a) 01KM
General Civil Work
15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.
PROVN OF 02 NOS BOREWELL ALONGWITH ALLIED PIPE LINE WORKS AND 50000 GLN SUMP FOR SFC IN THE AREA OF AGE (U) WS NO II UNDER GE (U) WATER SUPPLY DELHI CANTT-10
... by HDD (Horizontal directional drilling method) including preparing and setting up the plant and equipment. Preparing new pipe work material including all related civil work and mechanical work like excavation, shoring/strutting etc drilling, stringing, reaming and pulling back ...