| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.7 LAccepted-AOC | ₹23.7 L | L1 | Accepted-AOC Agreement executed |
| 2 | L2₹24.0 LRejected-AOC | ₹24.0 L | L2 | Rejected-AOC Agreement executed |
| Sl No | Description | Qty | Unit | HIZAA CONSTRUCTIONS PRIVATE LIMTTED L1 | ABDUL RAHIMAN MASHOOD B I L2 |
|---|---|---|---|---|---|
| 1.00Compound wall | |||||
| 1.00 | 15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar | 158.71 | cum | 2,000 ₹3.2 L | 2,285.25 ₹3.6 L |
| 1.00 | 15.17.2:Dismantling steel work in single sections including dismembering and stacking within 50 metes lead in:Channels, angles, tees and flats | 164.5 | kg | 45 ₹7,402.59 | 3.04 ₹500.09 |
| 1.00 | 15.12.1:Dismantling doors, windows and clerestory windows (steel or wood ) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead:Of area 3 sq. metres and below | 60 | each | 900 ₹54,000 | 250 ₹15,000 |
| 1.00 | 15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge. | 87.38 | cum | 2,400 ₹2.1 L | 2,569.38 ₹2.2 L |
| 1.00 | 15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | 3.91 | cum | 2,450 ₹9,579.50 | 1,278.77 ₹4,999.99 |
| 1.01 | OD208584/2025-2026:Demolishing laterate work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | 121.54 | cum | 2,800 ₹3.4 L | 1,522.17 ₹1.8 L |
| 1.01 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 137.98 | cum | 345 ₹47,603.10 | 398.61 ₹55,000.21 |
| 1.01 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 8.55 | cum | 8,800 ₹75,240 | 5,263.16 ₹45,000.02 |
| 1.01 | OD108023/2025-2026:Dry rubble masonry with hard stone in foundation and plinth using non- departmental material | 51.06 | cum | 3,450 ₹1.8 L | 4,406.75 ₹2.2 L |
Tender Value
₹28.8 L
EMD Value
₹50,000
Closing Date
30 Jan 2026, 3:00 pmClosed
Exeutive Engineer
PWD,Buildings Division,Kozhikode
General Civil Work
2026_PWD_829879_1
62/EEBK/2025-26
Open Tender
Civil Works - Buildings
180 days
Vadakara
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,760
Yes
₹50,000
Yes
10 Mar 2026
22 Jan 2026
2 Feb 2026
22 Jan 2026
30 Jan 2026
22 Jan 2026
Compound wall
15.9.2:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In cement mortar
15.17.2:Dismantling steel work in single sections including dismembering and stacking within 50 metes lead in:Channels, angles, tees and flats
15.12.1:Dismantling doors, windows and clerestory windows (steel or wood ) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 metres lead:Of area 3 sq. metres and below
15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.
15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar
OD208584/2025-2026:Demolishing laterate work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources)
OD108023/2025-2026:Dry rubble masonry with hard stone in foundation and plinth using non- departmental material
2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
OD108022/2025-2026:Modified 7.2.1 Random rubble masonry by using department hard stone in superstructure above plinth level and upto floor five level, including leveling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) at window sills, ceiling level and the like.Cement mortar 1:6 (1 cement : 6 coarse sand)-using dept stone (60% stacked material)
OD110555/2025-2026:Random rubble masonry with hard stone in superstructure above plinth level and upto floor five level, at window sills, ceiling level and the like.Cement mortar 1:6 (1 cement : 6 coarse sand)
5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers
5.22A.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more
50.6.1.8:Solid block masonry using pre cast solid blocks (Factory made) of size 40x20x15cm or nearest available size confirming to IS 2185 part I of 1979 for super structure up to floor two level with thickness 15cm in: CM 1:6 ( 1 cement : 6 coarse sand etc complete
13.33.1:Pointing on stone work with cement mortar 1:3 ( 1 cement : 3 fine sand):Flush/ Ruled pointing
OD110595/2025-2026:Providing PVC pipes for weepholes as per direction of Engineer-in-Charge. 110 mm pipe 6kgf/cm2
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.04 MB
Tendernotice_2.pdf
PDF • 1.65 MB
Tendernotice_3.pdf
PDF • 0.26 MB
BOQ_1393837.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid