Loading…
Loading…
20,866 results • Best match
E-BID-01-2026-27 WORK NO 10
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar.
Heightening of Existing Drain-cum- Retaining Wall near Silo No-1 to Prevent Deposition of Coal Slurry on Railway Track and Below the Train Wagon Loading Hopper for Smooth Coal Loading Operations, at Lingaraj OCP, Lingaraj Area.
Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge.
BRICK LINING OF WATERCOURSES OF O/L RD 32000-R OF KOTLI MINOR DISTT. JALANDHAR
Cement Concrete 1:3:6 with stone Ballast or Shingle work mixing by Mechanical means using Concrete Mixer Volumetric Type
Annual Plan-VAZHAKKAD GP PRO 481/25-26-PANCHEERI KULAM KUNIYIL THODI ROAD RENOVATION IN WARD 11-General Civil Work
OD485138/2025-2026:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge. In cement mortar
Demolition of existing drainage,new drainage,scarifying the existing bituminous road surface, GSB Construction , providing and laying intelocking pavers, pcc work
Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.
Improvement of channel section of D6 RD 50 to 400M and RD 5200 to 5400M and Const of 2 no. culverts at RD 250 to 1600M near Vishwa Bharti School under UT Capex Budget 2025-26
Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge.
Providing and laying D.I. pipeline from pump house to Durga Builders in Badarpur AC-53. (MLA LAD Funds)
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar.
Construction of lanes and drains Along with RCC slabs, Gratings near h/o Smt. Renu devi to Ravinder Singh, near h/o Ramesh kumar to h/o Sumit Gupta, h/o Bansi Lal to Badhari Nath, near Akash medical shop to h/o Bitta, Lane no. 7 near h/no. 157, near
Demolishing R.C.C. Work manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge:
Repair and Renovation of park no 16 infront of house no 966 sector 20 Part II MC Sirsa.
[5.7.4]Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. 4. In cement mortar [Through Rate]
The work is for the construction of compound wall It include Demolishing PCC, DR, RR, Brick masonry etc. and construction of PCC, DR, RR, Columns. painting etc. The construction of rest house building is in final stage. .The work is very urgent nat
15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar