Loading…
Loading…
20,866 results • Best match
Construction of slab and roof for Hawan Shalla along with other allied works at Anand Dham Hushroo Budgam
Demolishing brick work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: In cement mortar
Construction of street from shop of Naresh (Rampura Road) to wall of Eklavya Stadium in ward no. 10 in MC Safidon.
[5.7.4]Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. 4. In cement mortar [Through Rate]
Construction of temporary Sheet pump-sheds at different places in Mine on as, when and wherever required basis at Amlohri Project.
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.
Upgradation/repair of lane and covering of drain near Amla Tutorial to H/o Sh. Satya Pal Tandon H.No 41Opposite Geeta Mandir Ward No 28
Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge.
Improvement of Toe Wall along footpath at Road No.40 (Vir Banda Bairagi Marg) under Sub Division NW R-13 and Division NW R-1, During 2025-26
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. (a) In cement mortar
Providing courtyard tile railing etc at GZSA Complex at New University Campus
Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge.
Please refer BOQ
Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge.
Construction of Drain,Puliya,crossing along Padampur road south side at Gajsinghpur
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In cement mortar
Job No.1146/2026 (HEW) Repair of damaged brick wall of park near H.No.718 in Sector-24 U/E Panipat and all other works are contingent thereto. (Re-Invited)
5.7.4 Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. 4 In cement mortar
Refer to BOQ
Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge.